My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP00103
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1-1000
>
ISFAPP00103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:03:41 AM
Creation date
10/5/2006 10:17:57 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
86CW0220
Stream Name
North Fork Piney River
Watershed
Piney River
Water Division
5
Water District
52
County
Eagle
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/- <br /> <br />(XI) <br />Colorado Water Conservation <br />86CW220 <br />Ruling of Referee <br />Page 2 <br /> <br />7. The date of initiation of Appropriation is January 16, 1986. ~ <br /> <br />'8. The amount of water claimed is 2.0 cubic feet of water per second of v' <br />time, absol ute/ DR. ~ ~AiUru\L.. FLOW J UJH1C-lT6Ve-e. it. Lt:'""5S. ~ <br /> <br />9. The water was first applied to the above beneficial use on January ~ <br />16, 1986, by action .of the Colorado Water Conservation Board under the <br />provisions of C.R.S. 37-92-102(3), 37-92-103(3), (4), (10). <br /> <br />The Referee does therefore conclude that the above entitled Application <br />should be granted and the 2.0 cubic feet of water per second of time is hereby <br />awarded for the purpose of maintaining a minimum stream flow as required to <br />preserve the natural environment to a reasonable degree on North Fork Piney <br />River between the beginning and end points as described in paragraph 5 above, <br />with Appropriation date of January 16, 1986, absolutely and unconditional <br />subject, however. to all earlier priority rights of oth~rs and to the <br />integration and tabulation by the Division Engineer of such priorities and <br />changes of rights in accordance with law; and provided that the Applicant <br />herein shall construct and maintain at its expense a suitable measuring device <br />and 9auging station as approved by the State Engineer of his representative <br />for'the purpose of administering this water right as required by law. <br /> <br />It is accordingly ORDERED that this Ruling shall be filed with the Water <br />Clerk subject to Judicial review. <br /> <br />It is further ORDERED that a copy of this Ruling shall be filed with the <br />appropriate Division Engineer and the State Engineer. <br /> <br />Dated <br /> <br />BY THE REFEREE: <br /> <br />(.;o~v ,. ,. evI <br />,J. ...., ..,_~ ," .. / ... <br />Counsel of record.::\Vate' .c t~ all <br />Referee-1)iv. Engjneer~and <br />Slate Engineer-"liate J/- Jt./-A't <br />~TII"T.Q <br />OeputyClerk. wltert~~l <br /> <br />.- <br />_,,-' ./ . ._ /~:-;)//.r,,-, ,.di:: -.,....(,.... <br />Water Referee <br />Water Division No. 5 <br />State of Colorado <br /> <br />No protest was filed in this matter. The foregoing Ruling is confirmed <br />and approved, and is made the Judgment and Decree of this court. <br /> <br />Dated <br /> <br />Water Judge <br /> <br />------~ --'- - - - -.- _.'- --~ -,- - - ---=- <br />
The URL can be used to link to this page
Your browser does not support the video tag.