My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP00075
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1-1000
>
ISFAPP00075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:03:38 AM
Creation date
10/5/2006 10:17:52 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
85CW0628
Stream Name
Hull Creek
Watershed
Williams Fork River
Water Division
5
Water District
51
County
Grand
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />(I) <br />Colorado Water Conservation Board <br />Ruling of Referee <br />Page 2 <br /> <br />. <br /> <br />85CW628 <br /> <br />9. The water was first applied to the above beneficial use on November <br />8, 1985, by action of the Colorado Water Conservation Board under the <br />provisions of C.R.S. 37-92-102(3), 37-92-103(3),(4),(10). <br /> <br />The Referee does therefore conclude that the above entitled application <br />should be granted and that 1.0 cubic foot of water per second of time is <br />hereby awarded for the purpose of maintaining a minimum stream flow as <br />required to preserve the natural environment to a reasonable degree on Hull <br />Creek between the beginning and end points as described in paragraph 5 above, <br />with appropriation date of November 8, 1985, absolutely and unconditionally; <br />subject, however. to all earlier priority rights of others and to the <br />integration and tabulation by the Division Engineer of such priorities and <br />changes of rights in accordance with law; and provided that the applicant <br />herein shall construct and maintain at its expense a suitable measuring device <br />or gauging station as approved by the State Engineer or his representative for <br />the purpose of administering this water right as required by law. <br /> <br />It is accordingly ORDERED that this Ruling shall be filed with the Water <br />Clerk, subject to Judicial review. <br /> <br />It is further ORDERED that a copy of this Ruling shall be filed with the <br />appropriate Division Engineer and the State Engineer. <br /> <br />Dated H/!lIOI .3~ I"~G. <br /> <br />BY THE REFEREE <br /> <br />Copy of the foregplng m'lIed~1I <br />Counsel of J.9cord-'-Wat~r ./ <br />Aeferee~Olv. Eoolneer*""Jld <br />En ineer..LO te i.J .0" - no <br /> <br /> <br />Deputy eler Wat., Div. No.5 <br />~ <br /> <br />~"f. ~ <br />Re e ree <br />ater Division No. 5 <br />State of Colorado <br /> <br />No protest was filed in this matter. The foregoing Ruling is confirmed <br />and approved, and is made the Judgment and Decree of this Court. <br /> <br />Dated 4 ,~J 2~ /rSc. . <br /> <br />Copy of the foreag\ng mailed to all <br />Counsel .0yecord~W.ty <br />Aeferae-"-Olv. ~neer-=-<lnd <br />S En naer-Date ."5.():J.-81, <br /> <br /> <br />~~~ <br />ter J ge <br />
The URL can be used to link to this page
Your browser does not support the video tag.