My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP00007
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1-1000
>
ISFAPP00007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:03:30 AM
Creation date
10/5/2006 10:17:37 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
84CW0382
Stream Name
Henson Creek
Watershed
Gunnison River
Water Division
4
Water District
62
County
Hinsdale
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />'~ <br /> <br />IT IS THEREFORE ORDERED AND DECREED: <br /> <br />Name and address of claimant: <br /> <br />The Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />WATER RIGHT <br /> <br />Name of natural stream: Henson Creek. <br /> <br />Location: Legal description of beginning and end points of <br />minimum stream flow claimed: The natural stream channel from the <br />confluence with Palmetto Gulch at lat. 37 deg. 58'53"N, long. 107 <br />deg. 33'26"w as the upstream terminus and the confluence with <br />North Fork Henson Creek at lat. 38 deg. 00'25"N, long. 107 deg. <br />27'30"W as the downstream terminus being a distance of approxi- <br />mately 6.7 miles. This segment can be located on the Un~ompahgre <br />Peak, Redcloud Peak and Handies Peak U.S.G.S..quadrangle(s). <br /> <br />Administration: For the stream segment(s) in an unsurveyed <br />area, the division engineer has determined for administrative <br />purposes that the approximate legal description of the instream <br />flow termini as protracted from U.S.F.S. Planimetric (1:31,680) <br />mapping is as follows: Upstream terminus in the SE/4 NW/4 SW/4 <br />S17 T43N R6W NMPM approximately 1110 ft. East of West Line; 1610 <br />ft. North of South Line; downstream terminus in the SW/4 SW/4 <br />SE/4 S6 T43N R5W NMPM approximately 2060 ft. West of East Line; <br />110 ft. North of South Line. <br /> <br />. <br /> <br />Priority date: May 4, <br />. ri~ht shall be junior to all <br />pr10r to 1984, and otherwise <br />37-92-306, C.R.S. (1973). <br /> <br />1984 provided, however, that this <br />priorities awarded in cases filed <br />junior as provided in section <br /> <br />Instream flow amount: <br /> <br />9.0 c.f.s. absolute. <br /> <br />Use of water: To maintain such minimum flows as are <br />required to preserve the natural environment to a reasonable <br />degree pursuant to sections 37-92-102 and 103, C.R.S. (1985 <br /> <br />-2- <br /> <br />I . <br />
The URL can be used to link to this page
Your browser does not support the video tag.