Laserfiche WebLink
<br />". <br /> <br />" <br /> <br />. . Agreement. . <br />Black Canyon of the Gnnnison National Park' <br /> <br />The undersigned parties, representing the Department of the Interior and the Colorado Water' <br />Conservation Board (CWCB), a division of the Colorado Department of Natural Resources, <br />hereby agree to the following: <br /> <br />. . . . <br />. . <br />. . <br />. . . <br />1. The National Park Service shall hold and benefit from a water right for the Black Canyon .' <br />of the Gunnison National Park, located on the Gunnison River in Colorado. The water <br />right shall be quantified for the Gunnison River from below the Gunnison Diverson Dam . <br />through the Black Canyon to the confluence with the North Fork of the Gumiison River, <br />in two parts, as follows: <br /> <br />a: A federal reserved water right of 300 cfs or natural flow, whichever is less, with a 1933 <br />priority date. Such federal water right will satisfy the CWCB's existing instreain flow <br />decree. <br /> <br />. . . <br />. . <br />. . <br />. . <br />b. An instream flow water right under Colorado law with a 2003 priority date. Beginning <br />. with each year's April 1 forecast from the Colorado River-River Forecast Center, if Blue <br />Mesa Reservoir is projected to fill and spill by July 31, water beyond that which satisfies <br />. . present and future obligations of the authorized purposes of the Aspinall Unit, as specified <br />in the Colorado River Storage Project Act, 43 U.S.C. 9 620 et seq., as amended through <br />the date of this agreement, shall be held by the CWCB for decreed instream flow purposes <br />with a 2003 priority date. <br /> <br />. .. <br />. .-' .' , . <br />. . . . <br />. . <br />i. . As reflected in the chart below, the Bureau of Reclamation anticipates that, based <br />. on current operations of the Aspinall Unit pursuant to the authorized pmposes <br />(after the subordination of the Aspinall Unit to 60,000 acre-feet of depletion. .' <br />. upstream of the Unit for in-basin water use), the peak flow amounts reflected in <br />the chart can be reasonably expected, based on historical averages of the last .' <br />twenty-six years, to pass through the Aspinall Unit system by the Bureau of <br />. Reclamation through its operations, to be exercised by CWCB for the instream <br />. flow right with a 2003 priority .date. There is no guarap.tee that these same' . <br />amounts will be available in the future, however, becalise the ultimate amount of. <br />. water that will be available inthe future is dependent upon many factors, Including <br />. . where the water is removed from the system, the hydrology and the timing of the .' <br />hydrology~ future project demand, and reservoir elevation at the beginning of the <br />run-off season. In light of these considerations, on an annual basis and prior to the . <br />spring run-off, the Bureau of Reclamation shall consult with the National Park <br />Service, the Western Area Power Administration, the United States Fish and <br />Wildlife Service, the CWCB, the Colorado Water River Water Conservation <br />