My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Steamboat Lake water release requests
CWCB
>
Instream Flow Acquisitions
>
Backfile
>
Steamboat Lake water release requests
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:29:25 AM
Creation date
10/5/2006 10:17:08 PM
Metadata
Fields
Template:
Instream Flow Acquisitions
Case Number
95CW0150
Stream Name
Yampa River
Watershed
Yampa River
Water Division
6
Water District
58
County
Moffat
Instream Flow Acq - Doc Type
Contracts, MOA/MOU, Leases, Agreements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-----~.~~ <br /> <br />I <br />I- <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />, <br />I <br />II <br />, <br />II <br />II <br />I <br />III~ <br />I <br />" <br /> <br />-- <br /> <br />-- <br /> <br />", <br /> <br />lt~;'~ <br />:r~'JI <br />t,' "''f': <br />J:, ;-) <br />" ",',.; <br />~ "' <br />,:1i:-- _e/J <br />j;' ;J <br /> <br />. <br /> <br />. <br /> <br />Colorado-Ute Electric Association, Inc. <br />Schedule for Purchases from <br />Qualifying Cogenerators and Small Power Producers <br />with a Design Capacity of 100 kw or Less <br /> <br />$-. <br />fri.' <br />J- " <br />-,;": ',,:, <br />,,' <br />,. <br /> <br />. <br /> <br /> <br />x. <br />, <br />~- <br /> <br />AVAIt.ABILI'lY1 <br />Available to all qualifying cogenerators and amall power <br />producers (Qualifying Facilities) with a design capacity of 100 kw <br />or lesa which are located in the aervice territory of a retail <br />distribution cooperative association whiCh is a member of <br />Colorado-Ute Electric Association. Inc.. and whiCh has been <br />exempted from regulation by the COlorado Public Utilities <br />Conuni as ion. <br /> <br />. <br /> <br />~l* <br />1. Monthly Rate to Be Paid for Energy Only $.012 per kwh <br />2. Monthly Rate to Be Paid for Power and Energy <br /> Performance Criteria: <br /> 1) Dispatchable by Colorado-Ute $.035 per ~h <br /> 2) Annual plant factor** 80\ or greater $.035 per kwh <br /> 3) Monthly plant factor** 60\ or greater $.035 per kWh---' <br /> 4) Monthly plant factor** 40' or greater but <br /> less than 60' $.028 per kWh <br /> 5) Monthly plant factor** 20' or greater but <br /> less than 40\ $.020 per kWh <br /> 6) Mont.hly plant factor** less than 20\ $.012 per kwh",.. <br /> <br /> <br />*Rates will be updated annually. <br />**Plant factor may be computed in either of two ways at the option <br />of the Qualifying Faeility: <br /> <br />'" <br />. <br /> <br />Plant faetor · Energy delivered to Utility (kwh) .x 100 <br />, Hours]l; Maximum 30-minute power (kW) <br /> <br /> <br />where maximum 30-minute power (kw) is: <br />(1) MaXimum 30-minute power produeed during the metered <br />period .s .easured by a demand meter: <br />or <br />(2) Maximum 3D-minute pO;;r rating of the generating facility <br />as mutually agreed by the Qualifying Faeility and the . <br />Utili ty, thereby eliminating the need for a de.and meter. <br /> <br />,/ <br /> <br /> <br />..;r,. .;;. __""",, <br /> <br />,; <br />
The URL can be used to link to this page
Your browser does not support the video tag.