My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Acquisition Agreements
CWCB
>
Instream Flow Acquisitions
>
Backfile
>
Acquisition Agreements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:35:40 PM
Creation date
10/5/2006 10:17:05 PM
Metadata
Fields
Template:
Instream Flow Acquisitions
Case Number
1-90CW193A
Stream Name
Boulder Creek
Watershed
Boulder Creek
Water Division
1
Water District
6
County
Boulder
Instream Flow Acq - Doc Type
Contracts, MOA/MOU, Leases, Agreements
Supplemental fields
Case Number Issue
Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /><l <br /><::> <br /> <br />() <br />~ <br /> <br /> <br />~ <br /> <br />:0; 060,,1 3 08/27( ,) 03, 45 F'M G:E,;L ESTHE F'['F'D'" <br />Fio40 LHARLOTTE HOUSTON BOULDER CNTY ~O-R~C~~riE~ <br /> <br />STm aoealiOOARY fEE <br />AUG 2 7 1990 <br />v~~mf-l <br /> <br />DEED <br /> <br />This deed is <br />City of Boulder, <br />(hereinafter the <br />Board, an agency <br />"Board"). <br /> <br />J ~" i1--J.. <br />made this "\ 'day of fJl"4(}.( 1990 by the <br />Colorado, a Colorado muni~ipal corporation <br />"City"), to the Colorado"-Water Conservation <br />of the State of Colorado (hereinafter the <br /> <br />Subject to reservations hereinafter contained, the City <br />hereby conveys for due and sufficient consideration all of its <br />right, title and interest in the following-described water <br />rights (the "conveyed water ~ights"): <br /> <br />Farmers Ditch, 13.52 cfs out of 73.i9 cfs total decreed, <br />appropriation date October 1, 1862; <br /> <br />Anderson Ditch, 1.81 cfs out of 25 cfs total. decreed. <br />apprJpriation date October 1, 1860; <br /> <br />Smith and Goss Ditch, 0.4 cfs out of 44.3 cfs total <br />decreed, appropriation date November 15, 1859; <br /> <br />McCarty Ditch, 0.64 cfs out of 5.00 cfs total decreed, <br />appropriation date June 1, 186'2. <br /> <br />Harden Ditch. 1.8 cfs out of 21.0 cfs total decreed, <br />appropriation date June 1, 1862. <br /> <br />All originally decreed by the District Court in and for Boulder <br />County on June 2, 1882, and changed from irrigation to <br />municipal use by decree of the Water Court, Water Division No. <br />1 in Case Nos. W-7569, W-7570 and W-8520-77, entered May 31, <br />1989. <br /> <br />The Board shall use the described water rights solely to <br />maintain an instream flow not exceeding 15 cfa in the specified <br />reach of the mainstem of Boulder Creek in BOUlder County from <br />the PUblic Service company's hydroelectric plant outlet at <br />Orodell (NE 1/4, SW 1/4, Section 34, Township 1 North, Range 71 <br />West of the 6th P.M.) to the 75th Street Bridge (SW 1/4, <br />Section 13, Township 1 North, Range 70 West of the 6th P.M.) <br />(the "specified reach). The conveyance of the foregoing water <br />rights ~ subject to the following reservations by the City: <br /> <br />a. The City reserves the right to use water available <br />under the conveyed water rights for its municipal <br />purposes in the event of extraordinary drought <br />conditions or of emergency conditions involving the <br />loss of water to its municipal system as a result of <br />catastrophic events (such as failure of conveyance or <br />treatment facilities); provided. however, that <br />extraordinary drought conditions or emergency <br /> <br />c<- <br /> <br />I <br /> <br />--- <br /> <br />?p , <br />{ <br /> <br />~, <br /> <br />()Q <br />0> <br />P <br />o <br />0l <br />
The URL can be used to link to this page
Your browser does not support the video tag.