<br />'.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />I.
<br />i.
<br />.
<br />.
<br />.
<br />I.
<br />..
<br />.
<br />.
<br />.
<br />,.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />22
<br />
<br />02/23/00
<br />
<br />7 BIBLIOGRAPHY AND REFERENCES
<br />
<br />Chang, H. H., Fluvial Processes in River Engineering, Jolm Wiley & Sons, New York, 1988.
<br />
<br />Dawdy, D.R., "Flood Frequency Estimates on Alluvial Fans," Journal of the Hydraulics Division,
<br />ASCE, Proceedings, Vol. 105, No. HYII, pp. 1407-1413, November 1979.
<br />
<br />Federal Emergency Management Agency, F/ood Insurance Study Guidelines and Specifications for
<br />Study Contractors (FEMA 37), January 1995.
<br />
<br />Federal Emergency Management Agency, FAN An Alluvial Fan Flooding Computer Program
<br />User's Manual and Program Disk, September 1990.
<br />
<br />Federal Register, 44 CFR Parts 59, 60, and 65, Rules and Regulations, Vol. 54, No. 156, August 15,
<br />1989,
<br />
<br />Gomez, B., and M. Church, "An assessment of bed load sediment transport formulae for gravel bed
<br />rivers," Water Resources Research, Vol. 25, No.6, p. 1161-1186, 1989.
<br />
<br />National Research Council, Alluvial Fan Flooding, National Academy Press, Washington, D.C.,
<br />1996.
<br />
<br />Simons, Li & Associates, Inc., Design Manualfor Engineering Analysis ofF/uvial Systems, prepared
<br />for Arizona Department of Water Resources, Tucson, Arizona, 1985.
<br />
<br />U.S. Army Corps of Engincers (USACE), Guidelinesfor Risk and Uncertainty Analysis in Water
<br />Resources Planning, Report 92-R-l, Fort Belvoir, Virginia, 1992.
<br />
<br />Yang, C. T., and S. Wan, "Comparison of selected bed-material formulas," ASCE Journal of
<br />Hydraulic Engineering, Vol. 117, p. 973-989, 1991.
<br />
|