My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10292
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:44 AM
Creation date
10/5/2006 5:04:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Stream Name
South Platte River
Basin
South Platte
Title
Project Manual for Construction of Weldona Flood Control Improvements
Date
7/1/2001
Prepared For
Morgan County
Prepared By
WRC Engineering, Inc.
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT VIII..!, Cent. <br /> <br />Contractor, and any payment so made by the Owner shall be considered as a payment made under <br />the Contract by the Owner to the Contractor and tM Owner s~Ii311 not be liable to the Contractor for any such <br />payments made in good faith. <br /> <br />26. Acceptance of Final Payment Constitutlls Releas'l <br /> <br />The acceptance by the Contractor of final payment shall be and shall operate as a release to the Owner of <br />all claims and all liability to the Contractor for all thin9s done or furnished in connection with this work and for <br />every act and neglect of the Owner and oth'ors relating to or arising out of this work. No payment, however, <br />final or otherwise, shall operate to release the Contractor or his sureties from any obligations under this <br />Contract or the Performance and Payment aond. <br /> <br />2". Payments by Contractors <br /> <br />The Contractor shall pay (a) for all transportation and utility services not later than the 20th day of the calendar <br />month following that in which such materials, tools, and equipment are delivered at the site of the project, and <br />the balance of the cost thereof, not later thcln the 30th day following the completion of that part of the work <br />in or on which such materials, tools, and equipment are inc;orporated or used, and (c) to each of his <br />subcontractors, not later than the 5th day following each payment to the Contractor, the respective amounts <br />allowed the Contractor on account of the work performed by his subcontractors to the extent to each <br />subcontractor's interest therein. <br /> <br />28. Insurance <br /> <br />The Contractor shall not commence work under this contract until he has obtained all the insurance required <br />under this paragraph and such insurance has been approved by the Owner, nor shall the Contractor allow <br />any subcontractor to commence work on his subcon'iract until the insurance required of the subcontractor has <br />been so obtained and approved. <br /> <br />(a) COMPENSATION INSURANCE: The Contrac;lor shall procure and shall maintain during the <br />life of his Contract Workmen's Compensation Insurance as required by applicable State law for all of his <br />employees to be engaged in work at the site of the project under this contract and, in case of any such work <br />sublet, the Contractor shall require the subcontractor similarly to provide Workmen's Compensation Insurance <br />for all of the latter's employees to be engaged in Buch work unless such employees are covered by the <br />protection afforded by the Contractor's Workmen's Compensation Insurance. In case any class of employees <br />engaged in hazardous work on the project undel" this Contract is not protected under the Workmen's <br />Compensation Statute, the Contractor shall provide and shall C<luse each subc;ontraclor to provide adequate <br />employer's liability insurance for the protection of such of his Elmployees as a,re not otherwise protected. <br /> <br />(b) CONTRACTOR'S PUBLIC LIABILITY AND PROPERTY [)AMAGE INSURANCE AND <br />VEHICLE LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this <br />Contract Contractor's Public Liability Insurance, Contractor's Property Damage Insurance and Vehicle Liability <br />Insurance in the amounts specified in the Supplemental General Conditions. <br /> <br />(c) SUBCONTRACTOR'S PUEILIC LIABILITY AND PROPERTY DAMAGE INSURANCE AND <br />VEHICLE LIABILITY INSURANCE: The Contractor shall either (1) require each of his subcontractors to <br />procure and to maintain during the life of his subcontract, Subcontractor's Public Liability and Property <br />Damage Insurance and Vehicle Liability Insurance of the :type and in the amounts specified in the <br />Supplemental General Conditions specified in subparagraph (b) hereof, (2) insure the activities of his policy <br />specified in subparagraph (b) hereof. <br /> <br />(d) SCOPE OF INSURANCE AND SPECIAL HAZARDS: The insurance required under <br />subparagraphs (b) and (c) hereof shall provide adequate protection forthe Contractor and his subcontractors, <br />respectively, against damage claims which may arise from operations under this Contract, whether such <br />operations be by the insured or by anyone directly or indirectly employed by I,im and, also <br /> <br />VIII-J-10 <br /> <br />(Revised 5199) <br />
The URL can be used to link to this page
Your browser does not support the video tag.