Laserfiche WebLink
<br />EXHIBIT VIII-J, Cont. <br /> <br />the plans and drawings covered by this contract any and all supplemental plans and drawings, and in <br />accordance with the directions of the Archi::ect/Engineer as given from time to time during the progress of <br />the work. He shall furnish, erect, maintain, and remove such construction plant and such temporary works <br />as may be required. <br /> <br />The Contractor shall observe, comply witll, and be subject to all terms, ,conditions, requirements, and <br />limitations of the contract and specificatior s, and shall do, carry on, and complete the entire work to the <br />satisfaction of the Architect/Engineer and the Owner. <br /> <br />12. Weather Conditions <br /> <br />In the event of temporary suspension of worl<, or during inclement weather, or whenever the <br />Architect/Engineer shall direct, the Contraclor will, and will cause his subcontractors to protect carefully his <br />and their work and materials against damage or injury from the weather. If, in the opinion of the <br />Architect/Engineer, any work or material shall have been damaged or injured by reason of failure on the part <br />of the Contractor or any of his Subcontractors so to protect his work, such materials shall be removed and <br />replaced at the expense of the Contractor. <br /> <br />13. Protection of Work Property - Emergenc:y <br /> <br />The Contractor shall at all times safely guard the Owner's property from injury or loss in connection with this <br />contract. He shall at all times safely guard and protect his own work, and that of adjacent property from <br />damage. The Contractor shall replace or make goocl any such clamage, loss or injury unless such be caused <br />directly by errors contained in the Contract or by the Owner, or his duly authorized representatives. <br /> <br />In case of an emergency which threatens loss or i~jury of property, and/or safety or life, the Contractor will <br />be allowed to act, without previous instructiDns from the Architect/Engineer, in a diligent manner. He shall <br />notify the Architect/Engineer immediately thereafter. Any claim for compensation by the Contractor due to <br />such extra work shall be promptly submittecl to the Architect/Engineer for approval. <br /> <br />Where the Contractor has not taken action but has notified Architect/Engineer of an emergency threatening <br />injury to persons or damage to the work of a1Y adjoi~ing property, he shall act as instructed or authorized by <br />the Architect/Engineer. <br /> <br />The amount of reimbursement claimed by the Contractor on account of any emergency action shall be <br />determined in the manner provided in Parawaph 17 of the General Conditions. <br /> <br />14. Inspection <br /> <br />The authorized representatives and agents of the Colorado D'''partment of Local Affairs shall be permitted <br />to inspect all work, materials, payrolls, records of personnel, invoices of materials, and other relevant data <br />and records. <br /> <br />15. Reports, Records, and Data <br /> <br />The Contractor shall submit to the Owner such schedule of quantities and costs, progress schedule, payrolls, <br />reports, estimates, records, and other data as the Owner may request concerning work performed or to be <br />performed under this contract. <br /> <br />16. Superintendence by Contractor <br /> <br />At the site of the work the Contractor shall ernploy a construction superintendent or foreman who shall have <br />full authority to act for the Contractor. It is understood that such representative shall be acceptable to the <br />Architect/Engineer and shall be one who can be continued in that capacity for the particular job involved <br />unless he ceases to be on the Contractor's payroll. <br /> <br />17. Changes in Work <br /> <br />Vdl-J.6 <br /> <br />(Revised 5199) <br />