My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10288
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:42 AM
Creation date
10/5/2006 5:04:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Upper Gunnison
Basin
Gunnison
Title
Upper Gunnison-Uncompahgre Basin Phase 1 Feasibility Study Final Report
Date
1/1/1989
Prepared For
Colorado Water Resources and Power Development Authority
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The TSC consists of representatives from the following organiz.ations: <br /> <br />Colorado Division <br />of Wildlife (CDOW) <br /> <br />Uncompahgre Valley Water <br />Users Association (UVWUA) <br /> <br />Colorado River Water <br />Conservation District (CRWCD) <br /> <br />United States Bureau of <br />Reclamation (USBR) <br /> <br />Colorado Water Conservation <br />Board (CWCB) <br /> <br />Upper Gunnison Water <br />Conservancy District (UGWCD) <br /> <br />Tri-County Water Conservancy <br />District (TCWCD) <br /> <br />The TSC's purpose has been to review the progress of the Study <br />periodically and provide advice and recommendations to the Authority <br />concerning the conduct 'of the Study. <br /> <br />The Advi sory Commi ttee is compri sed of represent at i ves from 21 <br />organizations that, taken together, represent a broad range of interests <br />relevant to the water resources of the Upper Gunnison and Uncompahgre <br />sub-basins. The intent when forming this committee was to ensure that <br />interested parties were aware of the study progress and interim results in <br />time for the study team to incorporate their advice and concerns. The <br />Advisory Committee members are listed in Table 1.2. The Advisory Committee <br />members were sent a copy of each Task Memorandum. They were also not i fi ed <br />when meetings were scheduled to discuss interim findings. Advisors were <br />encouraged to offer questions and comments at these meetings. The dates and <br />subjects of the meetings are listed in Table 1.3. <br /> <br />The Advisory Committee provided valuable direction throughout the course <br />of the effort. Given the wide range of interests represented on the Advisory <br />Committee, it is not reasonable to expect that a unanimous consensus be <br /> <br />3"~ <br /> <br />'" '.' <br /> <br />1-8 <br /> <br />I 10003139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.