Laserfiche WebLink
<br />B. Engineering and Water Quality Analyses and Legal Analyses <br /> <br />1. Status Quo <br />a. Analyze existing water quality data and determine if <br />additional sampling is needed <br />b. Identify treatment processes for current and future <br />needs <br />c. Determine facility location <br />d. Analyze system enlargement capabilities <br />e. Evaluate funding available <br />f. Prepare draft report <br /> <br />2. Acqu.isition of Direct Flow and/or Reservoir Sources <br /> <br />a. Select direct flow sources which could provide water <br />to the communities <br />b. Determine current market price of these rights <br />c. Evaluate transferability (amount of water realized after <br />a change in point of diversion and change in use) <br />d. Determine quality of water from existing data <br />i. Develop treatment schemes based on current and future <br />drinking water standards <br />ii. Evaluate state of the art treatment schemes <br />iii. Determine plant sizes and enlargement capabilities <br />iv. Determine cost of systems (land, design, construc- <br />tion, transmission, storage, operation and main- <br />tenance) . <br />v. Compare to existing costs <br />e. Provide total costs, acquisition and treatment, per tap <br />and per 1000 gallons. <br />f. Evaluate formation of appropriate management entity <br />g. Evaluate funding available <br />h. Prepare draft report <br /> <br />3. Service through existing utilities <br /> <br />4. <br /> <br />a. Central Weld County - Little Thompson <br />b. Union REA <br />c. Public Service/Ft. St. Vrain <br />d. City of Greeley <br />e. Other municipal suppliers (e.g., Thornton) <br />f. Combination of above with Windy Gap water acquisition <br />g.. Combination of above with Colorado Big Thompson water <br />acquisition <br />h. Evaluate formation of appropriate management entity <br />i. Evaluate funding available <br />j. Prepare draft report <br /> <br />Shallow aquifers <br />Assumes water quality <br />same as "Status Quo". <br />can be easily derived <br /> <br />and treatment facilities would be <br />Assumes costs for treatment facilities <br />from schemes previously developed. <br /> <br />3 <br />