My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10265
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:36 AM
Creation date
10/5/2006 5:03:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Basin
South Platte
Title
Joint Southern Weld County Water System
Date
2/23/1989
Prepared For
Weld County
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TASK I. <br /> <br />TASK I I. <br /> <br />EXHIBIT A <br /> <br />JOINT SOUTHERN WELD COUNTY WATER SYSTEM <br /> <br />FINAL SCOPE OP SERVICES <br /> <br />Task Force Meeting <br /> <br />To gather input from the Task Force on study guidelines and <br />generally discuss options to be studied. <br /> <br />Introductory Meetings <br /> <br />Introductory meeting with each Town Board at the appropriate time <br />during the study as"olrected oy eiic~TO'wn" <br />41 ____ <br /> <br />~ <br /> <br />. <br /> <br />TASK Ill. Gather and Review Existing Information <br /> <br />TASK I V . <br /> <br />. <br /> <br />A. Obtain and review Comprehensive Plans and other relevant studies <br />from each community <br /> <br />B. Obtain and reVlew area-wide planning documents <br /> <br />C. Obtain and review all existing information relative to treatment <br />capabilities and facilities <br /> <br />O. Obtain all available information pertaining to existing water <br />rights (including sources, yield analyses, and related data) <br /> <br />E. Tabulate existing water fees (to developers and builders) and <br />rates (to users) <br /> <br />F. Review existing water storage capabilities <br /> <br />G. Gather and review information on potential water providers in <br />the area <br /> <br />H. Obtain all existing information with respect to water quality <br /> <br />I. Draft report <br /> <br />J. Meeting to finalize goals and objectives <br /> <br />K. Final task report <br /> <br />Develop Water Supply Options (Sources). The RMC Project Team will <br />evaluate the following options, unless otherwise directed: <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.