My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10235
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:30 AM
Creation date
10/5/2006 5:01:15 AM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Canon City
Stream Name
Arkansas River & Tributaries
Basin
Arkansas
Title
Hazard Mitigation 404 Grand Application for FEMA - Includes 3 Maps
Date
2/1/1998
Prepared For
FEMA
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />II. PROPOSED SOLUTIONS <br /> <br />Three alternatives have been evaluated which address the regular flooding and sediment <br />deposition problems generated by the hogback drainage basins. <br /> <br />1. No Action <br />2. Partial Detention (Hogback Detention Master Plan) <br />3. Full Detention <br /> <br />No Action <br /> <br />The consequences of "no action" have been considered in the evaluation of alternative flood <br />mitigation measures. Summer thunderstorm events which resulted in flooding of residential and <br />business areas below the hogbacks occurred in 1991, 1994, 1996 and 1997. Although little <br />damage to structures was experienced during these events, cleanup and repair costs and <br />inconvenience to local residents and business owners were substantial. In 1997, total cleanup <br />and repair costs resulting from hogback drainage flooding were approximately $70,560 <br />(documentation provided in Appendix A). <br /> <br />As previously discussed, stormwater flows generated in the hogback basins are problematic both <br />in their magnitude and in the large sediment loads which they typically carry. The high cost of <br />cleanup and repair results mostly from sediment deposition in storm drains and on city streets <br />and sidewalks. The magnitude of flow generated produces severe street flooding even for <br />moderate storms. Residential and downtown streets are regularly turned into rivers flowing 6 to <br />12 inches deep. Figure II-I illustrates the extent of flooding and sediment deposition in the <br />North Ninth Street Basin which has accompanied the notable storm events of the 1990's. The <br />recurrence interval of these storms is difficult to ascertain because of widely varying rainfall <br />reports and the highly localized nature of thunderstorm events. Reported rainfall depths for the <br />1991 storm ranged from I to 6 inches; 1 to 3 inches were reported for the 1994, 1996 and 1997 <br />storms. Storm events resulting in substantial flooding and sediment deposition have occurred an <br />average of once every two years in the 1990's. <br /> <br />Detailed clean up cost data for the year 1997 and an estimate of average annual costs over the <br />past seven years have been provided by the City. Including a 15 percent administrative overhead <br />charge, clean up costs for 1997 were approximately $70,560. Based on the major storm of that <br />year being representative of the 1994 and 1996 storms but less severe than 1991, 1997 clean up <br />costs are thought to approximate the biannual cost for flood cleanup which should be expected <br />under the No Action Alternative (see Section V). The City estimates that average annual clean <br />up costs are approximately 75 percent of biannual costs or $52,920. If the No Action Alternative <br />is selected, the extent of flooding and sediment deposition delineated on Figure II-I are expected <br />to occur an average of once every two years. Annual clean up costs averaging $52,920 are <br />expected to be incurred even in years without severe thunderstorms. <br /> <br />II-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.