Laserfiche WebLink
<br />I <br />I TABLE n.3 <br /> PARTIAL DETENTION ALTERNATIVE COST ESTIMATES <br />I Unit Total <br /> Basin No. Item Quantity Unit Cost Item Cost <br />I Basin 2 Clear and Grub 1.2 AC $750 $900 <br /> Excavation 3,480 CY $3.75 $13,050 <br />I Embankment Fill 980 CY $3.75 $3,675 <br /> Bedding Material for Riprap 88 CY $35 $3,080 <br /> Riprap 197 CY $35 $6,895 <br />I 24-in CMP 60 LF $26.50 $1,590 <br /> Revegetation 1.8 AC $2,300 $4,140 <br /> Total Cost = $33,330 <br />I Basin 3 Clear and Grub 1.0 AC $750 $750 <br /> Excavation 3,950 CY $3.75 $14,813 <br /> Embankment Fill 1,200 CY $3.75 $4,500 <br />I Bedding Material for Riprap 106 CY $35 $3,710 <br /> Riprap 237 CY $35 $8,295 <br /> 24-in CMP 60 LF $26.50 $1,590 <br />I Revegetation 1.5 AC $2,300 $3,450 <br /> Total Cost = $37,108 <br /> Basin 4 Clear and Grub 0.6 AC $750 $450 <br />I Excavation 3,230 CY $3.75 $12,113 <br /> Embankment Fill 1,200 CY $3.75 $4,500 <br /> Bedding Material for Riprap 31 CY $35 $1,085 <br />I Riprap 68 CY $35 $2,380 <br /> 24-in CMP 60 LF $26.50 $1,590 <br /> Revegetation 0.9 AC $2,300 $2,070 <br />I Total Cost = $24,188 <br />Basin 5 Clear and Grub 0.7 AC $750 $525 <br /> Excavation 2,860 CY $3.75 $10,725 <br />I Embankment Fill 1,090 CY $3.75 $4,088 <br /> Bedding Material for Riprap 32 CY $35 $1,120 <br /> Riprap 73 CY $35 $2,555 <br />I 24-in CMP 60 LF $26.50 $1,590 <br /> Revegetation 1.1 AC $2,300 $2,530 <br /> Total Cost = $23,133 <br />I Basin 8 Clear and Grub 0.9 AC $750 $675 <br /> Excavation 3,250 CY $3.75 $12,188 <br />I Embankment Fill 1,090 CY $3.75 $4,088 <br /> Bedding Material for Riprap 72 CY $35 $2,520 <br /> Riprap 162 CY $35 $5,670 <br /> 30-in CMP (Transfer Basin 7 flows) 60 LF $34.50 $2,070 <br />I 24-in CMP (Basin 8 outlet) 60 LF $26.50 $1,590 <br /> Revegetation 1.4 AC $2,300 $3,220 <br /> Total Cost = $32,020 <br />I CostEst <br /> 1121/98 <br />I <br />