Laserfiche WebLink
<br /> <br />Great Western Core Area. The industrial plant site is called the Great Western Core Area <br />and includes sub-basins CWADIV 1 and CWADIV 2, CWAA, CWAB, CWAC, CSWAA, <br />and CSW AB. These sub-basins are described below. <br /> <br />Great Western Off-Site Area. The Great Western off-site area includes sub-basins GW 1, <br />GWR, and WAL 1. Descriptions of these sub-basins follow. <br /> <br />CWADIV 1 and CWADIV 2 - These sub~basins consist of the western-most portion of the <br />Core Area. They outlet to a channel lying on the west side of the northwest access road <br />that is tributary to the Walnut Creek Diversion Canal. <br /> <br />GW 1 - This sub-basin includes all of the Walnut Creek drainage basin that is tributary to <br />Great Western Reservoir and lies east of Indiana Street. All flows from the on-site Walnut <br />Creek basin are routed through this sub-basin. <br /> <br />GWR - This sub-basin consists of the surface area of Great Western Reservoir. <br /> <br />CW AA - This basin lies in the extreme northern portion of the Core Area. There are <br />typically no flows coming into the basin. This basin outlets to sub-basin W A 12. <br /> <br />Sub-basin WAL 1 includes that part of the Great Western Reservoir drainage basin that lies <br />west of the South Boulder Diversion Canal. It extends from the foothills at the mouth of <br />Coal Creek Canyon to the South Boulder Diversion Canal and was modelled as fully <br />discharging to W ADIV 3. A portion of WALl discharges directly to the canal as <br />inadvertent runoff. <br /> <br />CWAB - This basin lies in the northeastern portion of the Core Area. This basin outlets <br />to sub-basin WA 11, immediately west of Pond A-I. <br /> <br />CWAC - This basin lies in the northern part of the Core Area. It discharges to basin WA <br />12 through a long outfall sewer that passes underneath the parking area north of the plant <br />Protected Area (P A). <br /> <br />Standley Lake Drainal:e Basin <br /> <br />CSW AA - This basin includes the southern portion of the Core Area. The basin outlets <br />into sub-basin SW A 2 in the Buffer Zone and is eventually tributary to Pond B-S. <br /> <br />The Standley Lake drainage basin includes two land use areas, a Buffer Zone and an off-site <br />area. <br /> <br />CSWAB - This basin includes the central and east-central portions of the Core Area. It <br />outlets to sub-basin SW A 3, which includes the B-Series ponds. <br /> <br />Standley Lake Buffer Zone. The Standley Lake Buffer Zone includes sub-basins W 1 to <br />W 9, DIV 1 to DIV 3, and SW 1 to SW 3. Descriptions of these sub-basins follow. <br /> <br />The Core Area basins are further sub-divided for the Core Area analysis presented in <br />Section VII of this report. For purposes of the major drainage planning represented by <br />Sections III, IV and VI, the diversions of initial drainage (2S-year frequency) from one sub- <br />basin to another are ignored. This provides conservatism for flood management planning <br />in case of initial system failure during large floods. It also allows freedom in the planning <br />and design of initial (local) drainage works without concern about affecting the overall <br />Master Plan flood management facilities that are subject to regulatory control. <br /> <br />W 1 to W 9 - These sub-basins include the Woman Creek drainage basin between the South <br />Boulder Diversion Canal and Indiana Street. The basins lie south of the West Entrance <br />Road, the South Interceptor Ditch and the East Entrance Road. Sub-basins W 8 and W 9 <br />form a separate tributary of Woman Creek that feeds directly into Standley Lake. <br /> <br />DIV 1 to DIV 3 - These basins are those tributary to the South Interceptor Ditch and Pond <br />C-2. Sub-basins DIV 2 and DIV 3 lie between the South Interceptor Ditch and the Core <br />Area. Sub-basin DIV 1 includes Pond C-2. The basins outlet into sub-basin W 1. <br /> <br />SW 1 to SW 3 - These basins include the southern Woman Creek drainage area, including <br />Rocky Flats Lake and the Smart Ditch. The basins extend from upstream at the South <br />Boulder Diversion Canal to the confluence with the main stem of Woman Creek, <br />approximately 1,000 feet east of Indiana Street. The basins outlet into basin W 1. <br />