Laserfiche WebLink
<br />The Master Plan focuses on drainage and flood control concerns in order to model existing <br />physical parameters. A stormwater quality master plan is premature given the status of the <br />National Pollutant Discharge Elimination System application process, the negotiations on <br />the off-site water management alternative called Option B and the Colorado Water Quality <br />Control Commission's classification and standards hearing on Big Dry Creek. <br /> <br /> <br />WATER OUALITY <br /> <br />MANAGEMENT OPTIONS <br /> <br />The Master Plan concludes by describing the potential drainage and flood control <br />management options for the off-site, Buffer Zone and Core Area locations of the Rocky <br />Flats Plant study area. These options are designed to: <br /> <br />. Reduce or eliminate the probability that area flood water will enter the plant <br />site; <br /> <br />. Ensure that stormwater management facilities on the plant site are adequate <br />to conveyor store runoff for the design storm events; and <br /> <br />Inhibit runoff from leaving the plant site. D <br />