My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10164
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:11 AM
Creation date
10/5/2006 4:56:16 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Littleton
Stream Name
Slaughterhouse Gulch
Basin
South Platte
Title
Major Drainageway Planning
Date
4/1/1974
Prepared For
Littleton, DRCG, DHUD
Prepared By
Frasier & Gingery, Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />h. Report <br /> <br />In conjunction with the development of the master plan <br />drawings a written report has been prepared. The report <br />summarizes the work and studies completed within this <br />project and outlines the proposed master plan for the <br />Gulch. It is intended to supplement the interim report <br />prepared during the project. <br /> <br />i. Reproduction <br /> <br />Upon the completion of the report and planning drawings, <br />30 copies of the completed report and drawings will be <br />furnished to the City. The planning drawings have been <br />reduced to one-half scale and included with the report <br />text to combine all major documents into one volume. <br />Full scale reproducible mylar sepias of the original <br />drainage plan maps have been supplied to the City. <br /> <br />As required by the Contract, all calculations, studies and <br />miscellaneous information generated in this project is avail- <br />able to the City. We have not included all this information <br />in the report for obvious reasons. Also, the final report is <br />intended to supplement the interim report prepared in March <br />and therefore all the information conveyed in the interim <br />report has not been duplicated in the final report. <br /> <br />1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.