Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SLAUGHTERHOUSE GULCH <br />MAJOR DRAINAGEWAY PLANNING <br /> <br />TABLE OF CONTENTS <br /> <br />Letter of Transmittal <br /> <br />Section <br /> <br />I. Introduction <br /> <br />Study <br />A. <br />B. <br />C. <br /> <br />Area <br />Description <br />Geology <br />Status <br /> <br />II. <br /> <br />III. Hydrology <br />A. Design Points <br />B. Basin Parameters <br />C. Design Rainfall <br />D. Hydrographs <br /> <br />IV. Flood Plain Analysis <br /> <br />V. Flood Damage - Benefit Analyses <br /> <br />VI. Interim Planning <br />A. Alternative Plans <br />B. Recommendations <br />C. Environmental Impact <br />D. Alternative Slection <br /> <br />VII. Design Criteria <br />A. Tabulated Design Criteria <br />B. Maintenance Considerations <br /> <br />VIII. Master Plan <br />A. General <br />B. Drawings <br />C. Supplementary Plans <br /> <br />IX. Legal <br /> <br />X. <br /> <br />Costs' <br />, A. <br />B. <br />C. <br /> <br />Costs <br /> <br />Unit Costs <br />Estimated Costs <br />Review of Estimated <br /> <br />XI. Financing <br /> <br />XII. Summary and Conclusions <br /> <br />Appendix A - Environmental Impact Statement <br />Appendix B - Master Plan Drawings <br /> <br />Page <br />I-I <br /> <br />II-I <br />II-I <br />11-3 <br />II-3 <br /> <br />III-l <br />III-l <br />III-l <br />III-3 <br />III-4 <br /> <br />IV-l <br /> <br />V-I <br /> <br />VI -1 <br />VI-l <br />VI-6 <br />VI-8 <br />VI-9 <br /> <br />VII-l <br />VII -1 <br />VII -3 <br /> <br />VIII-l <br />VI II-I <br />VI II - 2 <br />VI II - 9 <br /> <br />IX-l <br /> <br />X-I <br />X-I <br />X-2 <br />X-2 <br /> <br />XI-l <br />XII-l <br />