My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10073
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:07 AM
Creation date
10/5/2006 4:50:30 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Weld
Stream Name
Big Thompson
Basin
South Platte
Title
Big Thompson Disaster Recovery Report
Date
5/1/1977
Prepared For
Larimer-Weld Regional Council of Gov. & Big Thompson Recovery Planning Offfice
Prepared By
Toups Corporation
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />provides $187,667 in Federal funds and $93,833 in local <br />matching funds to develop a comprehensive plan for the <br />flood impacted area. Subsequent to award of the contract, <br />Toups Corporation of Loveland, Colorado, was contracted to <br />develop the comprehensive recovery plan. The planning <br />process was initiated in January, 1977. <br /> <br />The comprehensive plan will guide redevelopment efforts <br />in the flood impacted area. This will be accomplished by <br />identifying suitable land uses in the canyon on a parcel <br />by parcel basis as determined by natural constraints such <br />as geologic hazards and legal constraints such as the flood <br />plain zoning regulations. Numerous other critical determinants <br />will be explored including public input from canyon residents <br />obtained through an extensive public participation program. <br />It is anticipated that the comprehensive plan for the flood <br />impacted area will become part of the Larimer County <br />Comprehensive Plan.- <br /> <br />Figure 2 portrays the Program Schedule for the long range <br />comprehensive planning effort. Included in the program <br />schedule is the planning process, a time schedule, and <br />designation of the method by which public input and review <br />will be incorporated into the program. The program has been <br />divided into two phases, Phase A and Phase B, to allow <br />flexibility in defining Phase B through response to the <br />needs of the BTRPO and Larimer County. <br /> <br />In the definition of the program, the planning (flood <br />impacted area) boundary was identified. The primary <br />planning area includes the area within the Big Thompson <br />Canyon between Olympus Dam and the canyon mouth, the area <br />within the North Fork canyon between Glen Haven and the <br />confluence of the North Fork with the Big Thompson River, <br />and the flood impacted area between the mouth of the canyon <br />and an area just north of Boedecker Lake. <br /> <br />4 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />J <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.