Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, I <br />I <br />I <br />I <br />I <br /> <br />INTRODUCTION <br /> <br />On June 28, 1997 after several days of rainfall, the City of Fort Collins experienced <br />torrential rains from about five p.m. until about eleven p.m. During this time over five inches <br />of rain fell on Colorado State University's (CSU) main campus. In areas west and <br />southwest of the CSU campus over ten inches of rain fell during the six hour period, The <br />resulting runoff severely inundated the main campus, causing damage to 24 buildings and <br />costing millions of dollars in damages. <br /> <br />This report reviews stormwater flows on campus utilizing the SWMM hydrologic model used <br />in the 1996 drainage planning study for CSU. The study was presented in the June 1996 <br />report entitled, "Drainage Master Plan for Colorado State University." The master plan <br />outlined improvements to prevent damage to buildings during a 100-year event. In light of <br />recent events, the drainage master plan was reviewed to evaluate how the proposed <br />improvements would have performed, and how much damage could have been avoided. <br /> <br />The general approach was to utilize the original hydrologic model for the campus, and <br />simulate runoff from the 1997 storm. The model was calibrated to match the experienced <br />inundation and simulate the proposed improvements. The model evaluated potential <br />damage assuming proposed master improvements had been implemented, Master plan <br />recommendations are made from the results of these analyses. <br /> <br />This report is divided into four major sections as follows: <br /> <br />. Analysis of the 1997 Storm Event: This section provides the results from simulation <br />of the 1997 rainfall event on the CSU Campus, <br /> <br />. Review of the Proposed Master Plan: Proposed drainage improvements were <br />analyzed and reviewed using the 1997 rainfall conditions. This section summarizes the <br />results of the evaluation, <br /> <br />. Proposed Master Plan Revisions: Based upon evaluation results, and discussions <br />with facility services staff, revisions to the master plan were reviewed. <br /> <br />. Summary and Conclusions: The final section provides a summary of the report, and <br />presents recommended drainage plan improvements. <br /> <br />1 <br /> <br />Ayres Associates <br />