Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PROPOSED MASTER PLAN REVISIONS <br /> <br />The dominant flow that effected facilities on campus was the flow of water from the west of <br />campus, Therefore, improvements that would minimize the effects of inundation in the <br />lagoon/library parking lot area were focused on, Secondarily, minimizing the inundation in <br />the oval area was also studied. One consideration was to enlarge the storage capacity of <br />the athletic field detention ponds. Protection for the library, the student center, health <br />center, Eddy and Education Buildings was also considered. <br /> <br />The proposed ponding area for the athletic field was modified to increase storage volume. <br />The volume was increased from 44 ac-ft to 90 ac-ft, Also, the allowable storage elevation in <br />the lagoon/library parking lot area was assumed to be at an elevation of 5005 feet which <br />provides an additional 65 ac-ft of storage. <br /> <br />As a result the improvements were simulated by the model and summarized in Tables 5 <br />and 6. The results indicate that even with additional storage, the elevation of water in the <br />oval would be 4991,8 ft. which is about 6 ft. above the elevation of the heating plant. <br />Therefore the increased storage from the athletic field detention pond would make little <br />difference in the need for major protection of the oval area. <br /> <br />Table 5. Summary Elevation Results for the Simulation of the July 28-29, 1997 <br /> Rainfall Event with Revised Master Plan Improvements. <br /> Master Revised <br /> SWMM Plan Master Differ. <br />HWM Model Location Conditions Plan From <br /> Element (Elevation) (Elevation) Existing <br />#15&16 14 College Gym 4986,1 4986.1 -0.0 <br />#17-20 15 Heating Plant and Oval 4992,2 4991.8 -0.4 <br />#21-2 224 Engineering Parking Lot 4993.4 4993,2 -0,2 <br />#22 53 Lagoon NW of Student Center 5004,7 5004.6 -0.1 <br />#31 259 Athletic Fields - Football Practice 5024.5 5024,5 0.0 <br /> <br />Table 6. Summary Discharge Results for the Simulation of the July 28-29, 1997 <br /> Rainfall Event with Revised Master Plan Improvements. <br /> % <br />SWMM Master Plan Revised Differ. Reduction <br />Model Location Conditions Master from from <br />Element (cfs) Plan Existing Master <br /> (cfs) (cfs) Plan <br />14 College Gym 267 246 -21 8 <br />15 Heating Plant and Oval 251 231 -20 8 <br />224 Engineering Parking Lot 674 596 -78 12 <br />53 Lagoon NW of Student Center 1204 1069 -135 11 <br />259 Athletic Fields - Football Practice 1886 1886 0 0 <br />45 Prospect & RR 435 393 -42 10 <br />299 Lake Street 435 393 -42 10 <br /> <br />14 <br /> <br />Ayres Associates <br />