My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10053
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:41 AM
Creation date
10/5/2006 4:49:44 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
A Study to Identify Attitudes and Problems with Integrating Floodplain Management and Dam Safety
Date
8/1/1984
Prepared For
University of Denver
Prepared By
Stephen A. Spann
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />iv <br /> <br />From the 185 questionaires returned, <br /> <br />the following <br /> <br />major attitudes were discovered: <br /> <br />1. Developers of land below a reservoir should pay <br />for the required modifications to the dam. <br /> <br />2. Property deeds should inform the prospective owner <br />that the property lies in a hazardous area and should <br />indicate the probability of the hazard occuring. <br /> <br />3. Individuals should have the right to live <br />hazardous area if they are: <br /> <br />in <br /> <br />a <br /> <br />a. <br />b. <br /> <br />informed of the risk <br />willing to sign a waiver to claims <br />against the government for relief <br />willing to accept some form of <br />accountability if their children are <br />lost due to the hazard <br /> <br />c. <br /> <br />~ <br /> <br />4. Professional engineers practicing the design or <br />evaluation of reservoir dams should have a specialty license <br />as an indication that they are qualified and experienced to <br />do the work. <br /> <br />5. Even though costs of a dam safety program are <br />passed on to the consumer of water related products, the dam <br />owner should pay the cost of the program. <br /> <br />6. Dam owners of high and moderate hazard dams should <br />have qualified and licensed operators. <br /> <br />7. Respondees consider a dam safe if it has less that <br />one chance in a thousand of failing_ <br /> <br />Since <br /> <br />any <br /> <br />dam safety program should meet <br /> <br />the <br /> <br />objectives of <br /> <br />society, <br /> <br />the author <br /> <br />met <br /> <br />with professional <br /> <br />engineers from both the public and <br /> <br />private sector, dam <br /> <br />owners, floodplain managers, developers, social risk managers <br /> <br />and attorneys. <br /> <br />The group used the "nominal group process" to <br /> <br />identify social values and alternatjve dam safety programs. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.