Laserfiche WebLink
<br /> Plpestem Jamestown <br /> Time Elevation Gate Settings (feet) Release Elevation Gate Settings Ifeetl Release Combined <br />Date Hours 1ft, msll 36" Low Level 14'x7' East I 4'x7' West Icfs) (ft, msll No.2 I No.4 (cfs) Release Icfsl <br />6-Apr 0900 1457.1 0.00 0,00 1,40 225 <br /> 1700 1438.2 0,00 1.20 225 450 <br /> Releases were transitioned over to Jamestown Reservoir due to two main factors; (1) a revised April 5 forecast that <br /> indicated much higher runoff than was earlier forecasted with Jamestown pool approaching elevation 1440 ft, msl <br /> and (2) geotech agreed to postpone the Pipestem contrect until the drier fall months. <br />7-Apr James River opeations meeting was held in Jamestown between th COE, USSR, USFWS and other agencies, <br /> The plan of releasing 450 cfs combined for approximately 3 months followed by a 100 cfs release until November <br /> was presented, No one at the meeting vocalized any disagreement with this plan. <br />7-Apr 0900 1457.2 0,00 0.00 0,60 100 <br /> 1500 1438.6 0.00 1,88 350 450 <br /> See the comment for 6-Apr. The 450 cfs combined release with 100 cfs from Pipestem and 350 cfs from Jamestown <br />12-Apr Pipestem pool crests at elevation 1457.76 ft,ms!. <br />14-Apr Jamestown pool crests at elevation1439.34 ft,ms!. <br />7-May 0730 1456,9 0,00 0.00 0.00 0 1438.2 0.00 1.88 350 350 <br /> 1215 1456,9 0,00 0.00 0.60 100 1438,1 0,00 1.88 350 450 <br /> Pipestem shutdown for inspection of outlet works. <br /> <br />TABLE 13 (CONTINUED) <br /> <br />54 <br /> <br />.. <br /> <br />.. <br /> <br />. <br /> <br />'" <br />