Laserfiche WebLink
<br />VI. RESERVOIR OPERATION. Actual operations for the past year and proposed <br />operations through calendar year 1998 are discussed briefly in the following <br />subsections. Individual project operation summaries are contained in Appendix 1 <br />for Corps of Engineers projects and Bureau of Reclamation projects. Table 10 <br />summarizes the tributary reservoir flood control operation for 1998, A tabulation of <br />the number of cases that the exclusive flood control zones in the 36 Omaha District <br />tributary reservoirs have been filled to 25, 50, 75, and 100 percent is shown on <br />Table 11. <br /> <br />.. <br /> <br />A <br /> <br />. <br /> <br />. <br /> <br />44 <br />