Laserfiche WebLink
<br />V. RESERVOIR ACCOMPLISHMENTS. <br /> <br />a. Flood Damages Prevented. Flood damages prevented in FY98 by Corps <br />of Engineers Mainstem Reservoirs, Tributary reservoirs and local protection <br />projects, and Bureau of Reclamation projects are summarized in Table 7. Table 7 <br />also shows cumulative totals of flood damages prevented for each of the projects. <br />Flood damages prevented in each state are shown in Table 8. <br /> <br />, <br /> <br />b. Recreation Usage. Visitation hours for each Corps of Engineers project for <br />FY95, FY96, FY97, and FY98 are tabulated in Table 9. <br /> <br />. <br /> <br />~ <br /> <br />34 <br />