<br />" <br /> <br />~ <br /> <br />) <br /> <br />tL <br /> <br />PARCEL B: TEMPORARY CONST~UCTION EASEMENT <br /> <br />Includes the areas north and east of the ball field and <br />track area of Jefferson Hiqh School. All construction of <br />the storm pipe, detention embankment, and wall will occur <br />within this parcel as shown on Sheets 16, 17 and 18 of the <br />Upper Sloan Lake Storm Drainage Project-Schedule II plans, <br />which may vary with final design. This temporary easement <br />will be granted for construction only. <br /> <br />PARCEL C: TEMPORARY CONSTRUCTION EASEMENT <br /> <br />Includes the area east of the Lumberg Elementary School <br />building necessary to connect the existing detention pond to <br />the proposed Project with an underground pipe as shown on <br />Sheet 23 of the Upper Sloan Lake Storm Drainage <br />Project-SChedule II plans, which may vary with final design. <br />This ~em~o=a=y easement. will be g=anted :or cons~=uction <br />only. Mai ntenance of the project improvements wi thin this <br />area will be by the School Oistrict. <br /> <br />e: <br />/ <br /> <br />5. Construction of the improvements will not begin <br />until June 5, 1987, and will be completed on school sites by <br />no later than August 23, 1987. <br /> <br />6. Temporary fencing will be installed by Edgewater or <br />its =epresentatives around ?arcel 3, prior to construc~ion, <br />and will be maintained until construction is substantiallv <br />completed. . <br /> <br />7. Construction and rr~intenance motor vehicle access <br />will only be through the existing pierce Street parking lot <br />at Je==erson aigh School, and the east pedestrian access of <br />Lumber; ~lementa=y School. <br /> <br />8. Upon substantial completion of the project improve- <br />ments, all construction areBS will be restored to as close <br />to original condi~ion as possible at Project expense. The <br />grasseo areas will be sodded. <br /> <br />9. Upon substantial com~le~ion of ~he Project im~rove- <br />~ents, ~cgewa~e= will mai~~ain ~hese im~=ove~en~s wi~~i~ <br />pa=cel 3 and o:ovide si~e clean-u~ a:te: s~o=ms i~ which <br />the site is used :or storm de~entlon. Areas wi~hi~ <br />Pa~cels A a~c 3 camaged by s~orill de~e~tion, 0= cu=ing =eoai~ <br /> <br />e <br />../ <br /> <br />-3- <br />