Laserfiche WebLink
<br />Item Item Unit <br />No Item D~scrintion Ouantity Unit Prices Total Cost <br />40 Topsoil 100 CY $ $ <br /> (Words-Contract Unit Price) <br />41 Excavation 5,630 CY $ $ <br /> (Words-Contract Unit Price) <br />42 Embankment 100 CY $ $ <br /> (Words-Contract Unit Price) <br />43 Remove and Replace Unsuitable Materials 100 CY $ $ <br /> (Words-Contract Unit Price) <br />44 Environmental Controls 1 LS $ $ <br /> (Words-Lump Sum Price) <br />45 Traffic Regulation and Detours 1 LS $ $ <br /> (Words-Lump Sum Price) <br />46 Boulder Wail at Low Flow Channel 705 LF $ $ <br /> (Words-Contract Unit Price) <br />47 Dry Stacked Rock Wails 1,033 FSF $ $ <br /> (Words-Contract Unit Price) <br />48 Low Row Channel Invert Control <br /> Structure 2 EA $ $ <br /> (Words-Contract Unit Price) <br />49 Buried Type 'M' Riprap Slope Protection 550 CY $ $ <br /> (Words-Contract Unit Price) <br />50 Type 'M' Riprap 500 CY $ $ <br /> (Words-Contract Unit Price) <br /> <br />00300-7 <br />Issued with Addendum No.2 - 7 f23196 <br />