Laserfiche WebLink
<br />Item Item Unit <br />No. Item De.~riDtion Ouantitv Unit Prices Total Cost <br />BASE BID ITEMS: <br />1 Mobilization 1 LS $ * $ * <br /> (Words.Lump Sum Price) <br /> * (cannot exceed 5% of Base Bid) <br />2 Clearing and Grubbing 1 LS $ $ <br /> (Words-Lump Sum Price) <br />3 Demolition and Modifications 1 LS $ $ <br /> (Words-Lump Sum Price) <br />4 Topsoil 4,550 CY $ $ <br /> (Words-Contract Unit Price) <br />5 Excavation 49,290 CY $ $ <br /> (Words-Contract Unit Price) <br />6 Embankment 4,750 CY $ $ <br /> (Words-Contract Unit Price) <br />7 Remove and Replace Unsuitable Materials 100 CY $ $ <br /> , (Words-Contract Unit Price) <br />8 Environmental Controls 1 LS $ $ <br /> (Words-Lump Sum Price) <br />9 Traffic Regulation and Detours 1 LS $ $ <br /> (Words.Lump Sum Price) <br />10 Boulder Wall at Low Flow Channel 5,380 LF $ $ <br /> (Words-Contract Unit Price) <br /> <br />00300-3 <br />Issued with Addendum No.2 - 7173/96 <br />