My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09916
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:06 AM
Creation date
10/5/2006 4:44:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Statewide
Stream Name
All
Basin
Statewide
Title
Flood Mitigation & Recovery - An interactive exercise for local government
Date
11/5/1996
Prepared For
FEMA
Prepared By
FEMA
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />INSTRUCTIONS-TASK K. RECONSTRUCTION PLANNING <br />(Time to complete the task: 60 minutes) <br /> <br />Purpose <br /> <br />Identify opportunities for land use change and prepare a reconstruction plan for your <br />community's 100-year floodplain. <br /> <br />Materials <br /> <br />· Base map with information from Tasks A-J <br />. Handout F. Damage Assessment <br />· Handout I. Policies for Damaged Buildings <br />· Comprehensive plan, redevelopment plan, other plans, zoning maps <br />· Floodplain management ordinance <br />· Handout K. Planning Opportunities <br /> <br />Steps <br /> <br />1. Using the information accumulated on the base map and handouts and your <br />knowledge of the community and its plans, identify opportunities for changes in <br />land use and structures in the floodplain that could improve safety from floods and <br />achieve other community objectives. List the planning opportunities on Handout K. <br />Planning Opportunities. <br /> <br />2. Draw a proposed reconstruction plan for the floodplain on an overlay of the base <br />map. Show land uses, transportation changes, design features and other relevant <br />information. <br /> <br />3. Estimate how long you think it would take to complete and adopt a reconstruction <br />plan allowing for public hearings and full citizen participation. How long do you <br />think it will be before the damaged areas of your community are completely rebuilt? <br /> <br />Months for floodplain planning: <br /> <br />Years for reconstruction: <br /> <br />4. What problems did you have in preparing a reconstruction plan? On Handout 4. <br />Recommended Actions, list actions that the community might take now to prepare for <br />this task. <br /> <br />Products <br /> <br />. Handout K. Planning Opportunities <br />· Overlay of base map showing major features of the reconstruction plan <br />. Entries on Handout 4. Recommended Actions <br /> <br />Instructions-Task K <br />
The URL can be used to link to this page
Your browser does not support the video tag.