My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09916
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:06 AM
Creation date
10/5/2006 4:44:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Statewide
Stream Name
All
Basin
Statewide
Title
Flood Mitigation & Recovery - An interactive exercise for local government
Date
11/5/1996
Prepared For
FEMA
Prepared By
FEMA
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Recommended Schedule <br /> <br />The exercise can be completed in an 8-hour day with a break for lunch. It is fast-paced, <br />calling for intensive effort from the players during the playing period. The schedule is <br />deliberately tight to give players some sense of the pressure and tension that would <br />pervade such tasks after a real flood. It can be done in a single day as shown in the <br />schedule below. However, it can be spread over two days, perhaps starting in the <br />afternoon of the first day and finishing at noon on the second day. By doing this, the <br />players have time to rest and bring fresh perspective to the important tasks that come <br />later in the exercise. <br /> <br /> EXERCISE SCHEDULE <br /> Minutes <br />8:00 - 8:30 Introductions IExplanations 30 <br />8:30 - 9:10 Task A. Warning and Evacuation 40 <br />9:10 - 9:30 Task B. Emergency Shelter 20 <br />9:30 - 10:30 Task C. Damage Scenario 60 <br />10:30-10:50 Break 20 <br />10:50-11:10 Task D. Rerouting Traffic 20 <br />11:10-11:30 Task E. Restoring Services 20 <br />11:30-12:00 Task F. Damage Assessment 30 <br />12:00 - 1:00 Lunch 60 <br />1:00 - 1:20 TaskG. Temporary Business Locations 20 <br />1:20 - 1:40 Task H. Temporary Housing 20 <br />1:40 - 2:25 Task I. Policies for Damaged Buildings 45 <br />2:25 - 2:45 Task J. Permit Processing 20 <br />2:45 - 3:05 Break 20 <br />3:05 - 4:20 TaskK. Reconstruction Planning 75 <br />4:20 - 5:00 Task L. Mitigating Flood Hazards 40 <br /> <br />Facilitator's Instructions, page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.