My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09874
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:55 AM
Creation date
10/5/2006 4:42:54 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Use of Riprap for Bank Protection
Date
6/1/1967
Prepared By
USDOT
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />l <br />I <br />I <br />, <br /> <br />. <br /> <br />:; <br /> <br />I <br />I <br />~ <br />I <br />I <br />, <br />I <br />I <br />, <br />, <br />I <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />10-4 - Method at MeasureJlent <br /> <br />The quantity at riprap to be paid tor, at specitied thickness and <br />extent, in place and accepted, shall be measured by one ot the following <br />methods as specified for the type of riprap placed. Riprap placed out- <br />side the specitied limits will not be measured or paid for, and the <br />contractor may be required to remove and dispose of the excess riprap <br />without cost to the State. <br /> <br />(1) Per cubic yard: The quantity for dumped riprap, grouted rip- <br />rap, concrete riprap in bags, and filter blanket shall be the <br />number of cubic yards as computed from surface measurements <br />parallel to the riprap surtace and thickness measured normal <br />to the riprap surtace. <br /> <br />(2) Per square yard: The quantity tor wire-enclosed riprap and <br />concrete-slab riprap shall be the number at square yards <br />obtained by measurements parallel to the riprap surtace. <br /> <br />10-5 - Basis of Payment <br /> <br />The quantities determined, as provided in section 10-4, shall be paid <br />tor at the contract unit price per unit of measurement for each particular <br />item listed in the tol1oving schedule and shown in the bid schedule, which <br />price shall be full caapensation for tumishing all Il&terial, tools, and <br />labor; the preparation ot the subgrade; the p1ae11l8 of the filter blanket <br />when required; the placing ot the stone; the groutill8 when required; fur- <br />nishing steel for reinforced concrete-slab riprap; and all other york <br />incidental to tiniBhed construction in accordance with these specifications. <br /> <br /> Pay Item Un1 t of Measurement <br />( ) Dulllped riprap per cubic yard <br />( ) Wire-enclosed riprap per square yard <br />( ) Grouted riprap per cubic yard <br />( ) Concrete riprap in bags per cubic yard <br />- <br />( ) Concrete-slab riprap per square yard <br />( ) FU ter blanket per cubic yard <br />( ) Broken concrete riprap per cubic yard <br /> <br />. <br /> <br />11-43 <br /> <br />1> u. S. GOVERNMENT PRINTING OFFrCE : 1967 0 - 267-303 <br />
The URL can be used to link to this page
Your browser does not support the video tag.