Laserfiche WebLink
<br />TABLE 9 <br /> <br />STANDARD PROJECT FLOOD <br /> <br />MAXIMUM VELOCITIES <br /> <br />FOUNTAIN CREEK <br /> <br />Location <br />Mile <br /> <br />lYlaximum <br />Channel <br />ft. per sec. <br /> <br />Velocities <br />Overbank <br />ft. per sec. <br /> <br />2.09 <br /> <br />26.2 <br /> <br />7.2 <br /> <br />0.23 <br /> <br />21.7 <br /> <br />9.3 <br />. .. <br /> <br />Tables 10 and 11 show the total height of rise, the <br /> <br /> <br />maximum rate of rise, and the duration above bankfull stage of the <br /> <br /> <br />Intermediate Regional Flood and Standard Project Flood, respectively, <br /> <br />for typical flood plain sections on Fountain Creek. <br /> <br /> TABLE 10 <br /> INTERMEDIATE REGIONAL FLOOD <br /> RATES OF RISE AND DURATION <br /> FOUNTAIN CREEK <br /> Mile l1eight Time Maximum Duration <br /> Above of of Rate of Above <br />Location Mouth Rise ~ Rise Bankfull <br /> feet hours ft/hr hours <br />In upper reach 9.81 9.4 5.0 2.4 8.5 <br />In lower reach 1.59 10.1 ~.3 2.4 10.0 <br /> <br />:JB <br />