My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09831
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:45 AM
Creation date
10/5/2006 4:40:59 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Rye
Basin
Arkansas
Title
Floodplain Information Report
Date
2/8/1996
Prepared For
Rye
Prepared By
CWCB
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Table 1 <br /> <br />Estimated lOO-Year Peak Flows For Greenhorn Creek at Rye, CO <br /> <br />Stream Location Drainage Area (sq mi) IOO-Year Peak Flow <br /> in CFS <br />Greenhorn Creek at 10.5 4,848 <br />upstream town limit <br />Greenhorn Creek at 10.6 4,878 <br />downstream town limit <br /> <br />The Town of Rye should regulate the approximate floodplains on a case-by-case basis subject to <br />a detailed hydrologic and hydraulic analysis performed by a professional engineer, in accordance <br />with the determinations of the Colorado Water Conservation Board regarding the applicability of <br />the Guidelines. <br /> <br />Hvdraulic Analvsis <br /> <br />The hydraulic analysis for the preparation of the FHBM likely consisted of interpretation of <br />USGS quadrangle mapping by HUD's engineering consultant, along with telephone discussion, <br />with local officials. The telephone discussions addressed any historlc flood problems that may <br />have occurred in Rye. The FIA did perform and did not have the benefit of any detailed <br />hydrologic and hydraulic analyses for the preparation of the FHBM. Future hydraulic analyses <br />for determining I DO-year water surface elevations for approximate floodplains may be computed <br />using FEMA's Quick-2 computer program, the Corps of Engineers' HEC-2 computer program, <br />or other acceptable hydraulic methods. <br />
The URL can be used to link to this page
Your browser does not support the video tag.