My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09746
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:21 AM
Creation date
10/5/2006 4:37:09 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Colorado Statewide Drainage Floodplain Management Criteria Manual
Date
8/1/2002
Prepared By
CWCB & WRC Engineering Inc
Floodplain - Doc Type
Educational/Technical/Reference Information
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br /> <br />. <br /> <br />i <br />,; <br />i <br />:1 <br /> <br />CHAPTER 4 <br />FLOODPLAIN <br />ADMINISTRATION <br />AND <br />~ELlNEATION <br /> <br />WECTION 3.0 <br />FEMA MAP <br />REVISIONS <br /> <br />" <br /> <br />COLORADO STATEWIDE <br />DRAINAGE AND FLOODPLAIN MANAGEMENT CRITERIA MANUAL <br /> <br />on the FEMA Flood Insurance Rate Map or the flood insurance <br />requirements. <br /> <br />3.5.2 <br /> <br />REQUEST FOR LETTER OF MAP REVISION lLOMRI <br /> <br />After the drainage system for the project has <br />been constructed, the 'as-built" plans of the <br />facilities should be submitted to FEMA as a <br />Letter of Map Revision (LOMR) request with <br />the supporting hydrologic, hydraulic, <br />geomorphologic, and other data necessary to <br />reflect effects of the floodplain modifications. <br />The request for LOMR is submitted based on <br />the effects of physical changes that have <br />occurred in the floodplain or on the use of <br />altemative methodologies that are technically <br />superior. <br /> <br />The request for <br />LOMR is submitted <br />based on the effects <br />of physical changes <br />that have occurred in <br />the floodplain or on <br />the use of alternative <br />methodologies that <br />are technically <br />superior. <br /> <br />The procedures for a LOMR review are similar to those for a CLOMR review. <br />The specific requirements are outlined in the FEMA certification forms MT-2 <br />and the FEMA publications referenced in Section 3.1. A copy of these <br />procedures can be obtained from the local Floodplain Administrator or FEMA <br />website. <br /> <br />The LOMR request can be submitted to FEMA without obtaining a CLOMR in <br />advance for the project. However, for complex projects, it is recommended <br />that the applicant submit and obtain a CLOMR prior to construction since that <br />process will allow FEMA to review the proposed floodplain modifications and <br />make comments to the requester, if necessary. <br /> <br />AUGUST 2002 <br /> <br />FEMA MAP REVISIONS <br /> <br />CH4-309 <br />
The URL can be used to link to this page
Your browser does not support the video tag.