Laserfiche WebLink
<br />. <br /> <br /> <br />. <br /> <br />. <br /> <br />CHAPTER 5 <br />HYDROLOGY <br />SECTION 2.0 <br />RUNOFF <br /> <br />COLORADO STATEWIDE <br />DRAINAGE AND FLOODPLAIN MANAGEMENT CRITERIA MANUAL <br /> <br />CH5-T201 <br />CH5- T202 <br />CH5- T203 <br />CH5- T204 <br />CH5- T205 <br />CH5- T206 <br /> <br />CH5-F201 <br />CH5-F202 <br /> <br />CH5-F203 <br />CH5-F204 <br /> <br />CH5-SF201 <br /> <br />AUGUST 2002 <br /> <br />LIST OF TABLES <br /> <br />RATIONAL FORMULA METHOD RUNOFF COEFFICIENTS <br />RUNOFF CURVE NUMBERS <br />LAG EQUATION ROUGHNESS FACTORS <br />EXAMPLE: TIME OF CONCENTRATION <br />EXAMPLE: HEC-1 INPUT AND OUTPUT <br />EXAMPLE: CUHP OUTPUT <br /> <br />LIST OF FIGURES <br /> <br />, <br />TRAVEL TIME VELOCITY <br />PERCENTAGE OF IMPERVIOUS AREA VS. COMPOSITE CN'S FOR <br />GIVEN PERVIOUS AREA CN'S <br />EXAMPLE: PROPOSE ROSE SUBDIVISION LAYOUT <br />EXAMPLE: ROSE SUBDIVISION IDF CURVES <br /> <br />LIST OF STANDARD FORMS <br /> <br />TIME OF CONCENTRATION <br /> <br />RUNOFF <br /> <br />CH5-202 <br />