My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09727
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:18 AM
Creation date
10/5/2006 4:36:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
El Paso County
Stream Name
Dirty Woman Creek
Basin
Arkansas
Title
Dirty Woman Creek and Crystal Creek Drainage Basin Planning Study
Date
6/1/1992
Prepared For
El Paso County
Prepared By
Kiowa Engineering Corporation
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />figure 2~l. <br />Figute 2-2. <br />figure 2-3. <br />Figure 3-l. <br />Figure 3-2. <br />figure 3-3. <br />figure 3-4. <br />Figure 4,-l. <br />Figure 5-l. <br />Figure 5-2. <br />Figure 5-3. <br />Figure 5~4, <br />Figure 5-5. <br />Figun'! 5-6 <br />?~gun~ 6-1. <br /> <br />LIST OF FIGURES <br /> <br />L <br /> <br />INfRODUcrION: <br /> <br />""'-" <br /> <br />AuthorizHlion <br /> <br />Vicinity Map . <br /> <br />5 <br /> <br />This alternative evaluation of the Slonnwater facilities within the Diny Woman and <br />Crystal Creek Drainage Basins was authorized under the terms of the Agreement between the EI <br />Paso County and (County) and Kiowa Engineering Corporation, The agreement was approved <br />by the EI Paso County Board of County Commissioners July 22. 1991. <br /> <br />Hydrologic Soils ~~p <br /> <br />, <br /> <br />Proposed Land Use Map <br /> <br />8 <br />~2 <br />13 <br />14 <br />15 <br />20 <br /> <br />PUI'Ilose and Scove <br />The purpose of the study is 10 idenlify feasible stormwater management plans to satisfy <br />the existing and furore needs within the Diny Woman and Crystal Creek Drainage Basins. The <br />specific scope of work for this study included the following lasks: <br />1. Meet with the County to: insure compliance Wilb the services required by this <br />agreement. obtain existing data and general information from panicipating entities. <br />solicit de~ircs of participating entities and olber interested agencies or groups in order to <br />develop alternate plans, procure current information relalive to development plans in the <br />basin, procure information relative to right-of-way limitations. proposed stonnwater <br />projects, potential haUU"ds due to flooding, and avoid duplication or effon whenever <br />possible by utilizing existing information availabJe from otheragenci cs. <br />Contact the Coumy, Town of Monument, individuals. and other agencies who have <br />knowledge andIor interest in the study area, <br /> <br />Hydrologic Flow Chart <br />Flood Discharge Profile <br /> <br />Flood Discharge Profile <br /> <br />Flood Discharge Profile <br /> <br />Reach Delineation Map <br /> <br />Selective Improvement. Dirty Woman Creek <br />Reaches A and B . ' , <br /> <br />32 <br /> <br />lO-Year Channel Concept-Dirty Woman Creek <br />Reaches hand B. <br /> <br />_ 33 <br /> <br />2. <br /> <br />lO-Year Channel Concept-Crystal Creek <br />Reaches A and B. , . <br /> <br />.34 <br /> <br />3. <br /> <br />Utilil.e City/Counly dminage policies and criteria and applicable information wherever <br />possible. <br />Perform hydraulic and hydrologic analy~e~ wilhin the ~tudy area. <br />Identify environmental setting of basin. <br />Identifyexi~tingandpotentialdrainageand/orf100dingproblems_ <br />Develop improvement alternatives to reduce existing and potential flooding problems, <br />and to mitigale the impact of ~lOrmwaler runoff upon environmentally ~ignificant areas <br />along the drainagcway(s). <br /> <br />lO-Yeal- Channel Concept-La;"e Fork Dirty <br />'floman Creek Reach B. . <br /> <br />35 <br /> <br />4. <br />5. <br />6. <br /> <br />Selective Improvements. Lake Fork Dirty TNomsn <br />Creek Reach B ' . 36 <br /> <br />Typical Sections <br /> <br />,36;" <br /> <br />Improvement Plan <br /> <br />56 <br /> <br />,. <br /> <br />8. Examine the operation and mainlenli1\ce aspecls of feasible alternative s. <br /> <br />9_ Conduct an economic analysis or each allemative. <br /> <br />10. Recommend and prepare a preliminary <.k~ign for a selected alternative plan. <br />11. Prepare documemation and summary Tcport(s) sufficient ror lhe review and processing of <br />a Letter of Permission (LOP) lhrough thc Corps of Engineers. <br />12. Develop drainage and bridge fees for the basin. <br />13. Prepare a wriuen repon discussing all items examined in the study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.