Laserfiche WebLink
<br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />REQUEST FOR LETTER OF MAP REVISION <br />BOULDER CREEK - CITY OF BOULDER, COLORADO <br /> <br />1.0 INTRODUCTION <br /> <br />1 1 Purposf' of Study <br /> <br />Community Name: <br />County: <br />State: <br /> <br />City of Boulder <br />Boulder <br />Colorado <br /> <br />1.2 Author] ty and Acknowl f'dgf'rnf'nt <br /> <br />This request is being made as a result of over lot grading, <br />pond construction and wetland mitigation within the <br />University of Colorado at Boulder Research Park (UCBRP) along <br />Boulder Creek between Foothills parkway (Colorado Highway <br />157) and Colorado Avenue in the City of Boulder, Colorado <br />(Fig, 1), The 100-year storm discharge for fully developed <br />basin conditions was used as the design discharge for <br />delineation of the floOdp1ain/floodway boundaries, <br /> <br />The hydraulic analysis for this study has been prepared by <br />Love & Associates, Inc, (Engineer) for the project sponsor, <br />the UCBRP, As-built mapping used in this study was prepared <br />by GEONEX/DELTA of Denver, Colorado from aerial photography <br />taken on December 5, 1988, The 100-year floodplain and <br />floodway were originally delineated in a report prepared by <br />Muller Engineering Company, Inc, in January, 1983 (Ref, 1), <br />Hydrology for this submittal was obtained from the Flood <br />Hazard Area Delineation (FHAD) for Boulder Creek originally <br />performed by the U.S, Army Corps of Engineers and revised in <br />conjunction with the preparation of the 1983 FEAD, <br /> <br />1.3 Coordination <br /> <br />This LOMR request is a result of the construction of the <br />Drainage, Grading and Wetlands project at the UCBRP (Ref, 2). <br />The hydrology for the study has been accepted by the Urban <br />Drainage and Flood Control District (UD&FCD). Several <br />meetings and telephone conversations with personnel from FEMA <br />Region VIII, the City of Boulder (City), UCBRP and the UD&FCD <br />were held to coordinate the preparation of this report, <br />These meetings included an initial site walk-through in late <br />January, 1988 with representatives of FEMA Region VIII, the <br />Colorado Water Conservation Board (CWCB), UCBRP, UD&FCD, and <br />the City, Multiple design sessions with UD&FCD were held as <br />well as a preliminary design presentation at the site in mid- <br />May, 1988 with representatives of FEMA, UD&FCD, and the City, <br />A final design presentation was given to representatives of <br />