My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09719
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:16 AM
Creation date
10/5/2006 4:34:46 AM
Metadata
Fields
Template:
Floodplain Documents
County
Dolores
Stream Name
Monument Creek
Basin
San Juan/Dolores
Title
Dolores Project- Dawson Draw, Cortez Pipeline
Date
4/29/1985
Prepared For
Dolores
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />f <br />-' <br />". <br /> <br />~ <br /> <br />113-CM-85 <br /> <br /> <br />. <br /> <br />~ <br />(3itij of <3oie~, (301orJo <br /> <br />OFFICE OF THE CITY MANAGER <br /> <br />April 5, 1985 <br /> <br />Mr. Nick Ioannides <br />Colorado Water Conservation Board <br />823 State Centennial Bui1din9 <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />/i).f:', <br />!If; t;' J '_-" <br />/J,:r "i~"'r-.... <br />. ",' jr-. <br />"'/'l(f}''''"''"" <br /> <br />:{.~...' , / J{7/J! <br />'".r,,;Jjj, <br />.'l/ii':.>' tv.iJ <br />"']'1 reI'> <br />,[ So 'f <br />'liRD <br /> <br />Dear Nick: <br /> <br />We have reviewed the proposed Scope of Services for the Cortez Raw Water <br />Line Project and have the following comments: <br /> <br />1. Task 5 - Corridor Study <br /> <br />We feel that the scope of this task is significantly out of <br />proportion. The City of Cortez feels strongly about using <br />the existing right-of-way of record for the raw water line, <br />Please keep in mind that we are replacing an old line, not <br />building a completely new raw water distribution project. <br /> <br />We have no objections to other alternate routes being <br />examined, but the depth of analysis described in the pro- <br />posed Scope of Work is excessive. In practical terms, the <br />costs involved in relocating the line and negotiating new <br />easements would be excessive in terms of both money and <br />time. <br /> <br />We request, therefore, that Task 5 be significantly <br />reduced in scope and that primary emphasis be placed on <br />utilizing the existing alignment. <br /> <br />2. Task 7 - Survey and Togography <br /> <br />We have no specific problem with this task; however, it <br />should be noted that the work completed in this task will <br />be used for final designs. <br /> <br />3. Task 8 - Geotechnical Analysis <br /> <br />Our engineering staff feels that whereas soil boring will <br />be useful for determining available soil cover and rock <br />depths for design and construction, the areas of ground <br />water concern are evident and piezometers will be of <br /> <br />210 EAST MAIN STREET <br /> <br />CORTEZ, COlORADO 81321 <br /> <br />(303) 565-3402 <br />
The URL can be used to link to this page
Your browser does not support the video tag.