My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09719
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:16 AM
Creation date
10/5/2006 4:34:46 AM
Metadata
Fields
Template:
Floodplain Documents
County
Dolores
Stream Name
Monument Creek
Basin
San Juan/Dolores
Title
Dolores Project- Dawson Draw, Cortez Pipeline
Date
4/29/1985
Prepared For
Dolores
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />./. <br /> <br />~1 ,. <br /> <br />f <br /> <br />3. If no alternate routes are clearly comparable on a <br />cost basis, then use the existing alignment and do not <br />proceed with further study on the alternate alignments <br />(go to line 7). If other alignments show a strong <br />potential to be a better route at comparable costs, <br />then those alignments should be studied further. <br /> <br />4. Check with other agencies who may have conflicts with <br />alternate routes and determine land acquisition needs <br />that would be needed. <br /> <br />5. Prepare preliminary location plan sheets showing <br />feasible horizontal alignments and examine each for <br />cost-effectiveness, right-of-way locations (including <br />preliminary cost estimates), and interference with <br />above-ground and underground structures and utilities. <br /> <br />6. Identify the most feasible pipeline alignment between <br />the existing alignment and the other alternate routes <br />in conjunction with CWCB and the City of Cortez. <br /> <br />7. <br /> <br />Determine the pipeline <br />and industrial usage <br />generation. <br /> <br />size necessary for municipal <br />and effective hydropower <br /> <br />8. Establish the preliminary plan and profile drawings <br />for the route selected. <br /> <br />9. Review and select the most suitable pipeline materials <br />utilizing results from available geotechnical data. A <br />soils analysis is to be conducted as soon as the most <br />feasible alignment is selected. <br /> <br />Task 6--Hydropower Study. <br /> <br />1. Review hydraulic characteristics at the City reservoir <br />and water treatment plant including minimum, average, <br />and peak flow rates. <br /> <br />2. Evaluate power company requirements for generation and <br />purchase of hydropower. <br /> <br />3. Review power requirements at the City's filtration <br />plant. <br /> <br />4. Analyze various hydropower systems for applicability. <br /> <br />5. Evaluate equipment and associated costs. <br /> <br />6. Determine feasibility of a hydropower generating <br />system and recommend course of action. <br /> <br />Exhibit A-3 <br /> <br />3j15j85-R <br />
The URL can be used to link to this page
Your browser does not support the video tag.