Laserfiche WebLink
<br />. <br /> <br /> <br />Federal Emergency Management Agency <br />Washington, D,C. 20472 <br /> <br />NOV 2 7 2000 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.:;f()().OS.357R <br /> <br />The Honorable Noel Busck <br />Mayor, City of Thornton <br />9500 Civic Center Drive <br />Thornton, CO S0229 <br /> <br />Community: City of Thornton, CO <br />Community No.: OS0007 <br /> <br />104 <br /> <br />Dear Mayor Busck: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) comment on the <br />effects that a proposed project would have on the effective Flood Insurance Rate Map (FIRM) for Adams <br />County, Colorado and Incorporated Areas (the effective FIRM for your community), in accordance with <br />Part 65 of the National Flood Insurance Program (NFIP) regulations. In a letter dated August 9,2000, <br />Mr. Sam Sours, Gillans Incorporated, requested that FEMA evaluate the effects that proposed <br />construction of The Haven at York subdivision project along South Wadley Creek would have on the <br />flood hazard infonnation shown on the effective FIRM. The proposed project will include construction <br />of a culvert at York Street, realignment of South Wadley Creek, and channelization from its confluence <br />. with Big Dry Creek to the Union Pacific Railroad. <br /> <br />All data required to complete our review of this request for a Conditional Letter of Map Revision <br />(CLOMR) were submitted with letters from Mr. Sours. <br /> <br />We reviewed the submitted data and the data used to prepare the effective FIRM for your community and <br />detennined that the proposed project meets the minimum floodplain management criteria of the NFIP. <br />We believe that, if the proposed project is constructed as shown on the plans entitled "South Wadley <br />Creek Channel," prepared by Gillans Incorporated, dated May 17,2000, and the data listed below are <br />received, a revision to the FIRM would be warranted. <br /> <br />Because this request also affects the unincorporated areas of Adams County, a separate CLOMR for that <br />community was issued on the same date as this CLOMR. <br /> <br />The effective FIRM shows South Wadley Creek as a Special Flood Hazard Area (SFHA) designated <br />Zone A, an area that would be inundated by the flood having a I-percent chance of being equaled or <br />exceeded in any given year (base flood), with no Base Flood Elevations (BFEs) detennined. <br />Construction of the proposed culvert and channelization project along South Wadley Creek will result in <br />a decrease in the width of the SFHA. The base flood will be contained within the realigned and <br />channelized portion of South Wadley Creek from its confluence with Big Dry Creek to the Union Pacific <br />Railroad. <br /> <br />. <br />