My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09717
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:16 AM
Creation date
10/5/2006 4:34:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Community
Longmont
Stream Name
St. Vrain Creek
Basin
South Platte
Title
Floodplain Information Report
Date
4/1/1981
Prepared For
Longmont, Boulder County
Prepared By
WRC Engineering, Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Wt!1,r !hsourcet; Consultants <br /> <br />FIGURE - I <br /> <br /> <br />- <br /> <br />-1 <br /> <br />! <br /> <br />, <br /> <br />.1 <br /> <br />- <br /> <br />,- <br /> <br />~. <br /> <br />.. <br /> <br />, <br /> <br />, <br /> <br />'- <br />:-~-~_.. <br />'. "." <br />'.._.....~,.,.; <br />. .-;'}',~ <br /> <br />- <br /> <br />... <br /> <br />.. <br />" <br /> <br />UPSTf?EAM STUDY <br />LIMIT <br /> <br />.. <br /> <br />.' <br /> <br />. <br />, <br />, <br />, <br /> <br />5T. VRAIN CREEK <br /> <br />--. <br /> <br />.. <br /> <br />.~ <br /> <br />''''''''''~''..- <br /> <br />--C;,y'. <br /> <br />_. <br /> <br />DOWNSTREAM <br />STUDY LIMIT <br />,r <br /> <br />-. <br /> <br />.. <br /> <br />.- <br /> <br />^. <br />'- <br /> <br />, <br /> <br />'- <br /> <br />-1 <br />J <br /> <br />./ <br /> <br />" <br />..~. <br />~a"d L <br /> <br />.. <br /> <br />11. <br /> <br />1 <br />1 <br />, <br /> <br />M"." <br /> <br />- <br /> <br />^"\y' <br /> <br />~. <br /> <br />./" <br /> <br />.. <br /> <br />.r" <br /> <br />_.. .. <br /> <br />.. <br /> <br />n. <br /> <br />""_':O>""~ <br /> <br />~""" '1<1 <br /> <br />.. <br /> <br />_ STUDY REACH.sr VRAIN CREEK <br /> <br />13. <br /> <br />. <br />, <br />, <br />. <br />l""""""'" <br />,.' <br />. <br />, <br /> <br />SCALE: ('= 6600' <br /> <br />" <br />.. <br />, <br />- <br /> <br />V!CIN/Tr <br />M'P <br /> <br />". <br /> <br />~ <br /> <br />15. <br /> <br />.. <br /> <br />of 10"0 <br /> <br />.- <br /> <br />.-- <br /> <br />STUOY AREA LOCATION <br /> <br />-J- -4- <br /> <br />F~/NUOry, /98/ <br /> <br />4. Review the existing hydrology prepared hy the U.S. Army Corps of <br />Engirreers and make recommendations to the lechr.ical Commlttee <br />regarding the peak flo~s for the various ff~qu~ncies. Also, pro- <br />vide input to the Technical Committee regarding tho year 2000 <br />hydrology to h. dev~loped by the Corps. <br /> <br />5. Condu~t hydrauli~ analysis aimed at analyzing hydrauli~ st,u~tures On <br />St. Vrain Creek and to compute water surfa~e profiles tor the 5-, 10-, <br />50-, 100-, &nd 500.year frequency storms for both ~he existing and <br />future (year 2000) basin development ~onditions. <br /> <br />6. <br /> <br />D~linea[e the lOO-year flooded area" and present the floodway limits <br />on ad~inistrative ~p.. <br /> <br />7. Prepare a drainage plan for the Boulder County Fairgrounds. <br /> <br />8. Id~ntify existin8, potential future flooding ptoblems, snd other ptObtern5 <br />within the study tea~h. <br /> <br />9. Asaess the existing and potential flood damage. <br /> <br />10. <br /> <br />Evaluate altetnative feasibl~ plans for flood ptotection and draina~e <br />improv~m~nt" a~d ~re~~nt the same to the Teeh~ical Co~ittcc for the <br />selection of th~ final alternatives. <br /> <br />Ptepate eonceptual plan., dc~igns, and project eosts fot the <br />altetnstives and ~ke specific recommendations to the Technical <br />Committee regatding the posltive and negative aspects of each pL." <br />and the impact of each plan On the lOO-year floodplain. <br /> <br />Ptepate a cost/benefit cowpa.ison tor the selected plan tOt i~ple~eota- <br />ticn after finalizing the proposed plan of imptovements. <br /> <br />Prepare and submit a draft of the final report for review and approval. <br /> <br />Ptepare the final r~pon and the ,wcessary technical "ddendUl1l(.). <br /> <br />Ptesent the final teport. <br />
The URL can be used to link to this page
Your browser does not support the video tag.