My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09695
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:10 AM
Creation date
10/5/2006 4:33:21 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Basin
South Platte
Title
Project Notebook for I-25 Corridor Master Drainage Plan South Weld County: Volume 1 of 2
Date
12/6/1999
Prepared For
Weld County Public Works
Prepared By
Anderson Consulting Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- <br /> <br />Project Notebook Table I. Inventory of Existing Drainage Facilities - Godding Hollow Basin <br /> <br />e <br /> <br /> Existing Existing <br /> Maximum Maximum Condition Condition <br />Facility Name Location Condition Structure Storage Discharge Peak Peak <br />and/or Type [UDSWMM ID] Dimensions Volume Capacity' 2-Year 100Year <br /> (acre-ft) (cfs) Discharge Discharge <br /> (cfs) (cfs) <br /> MAIN CHANNEL <br />WCR 26 RCB Between WCR II and fair I span=8.5' N/A 210 560 1,890 <br />WCR 13 [202] rise=3' <br />Last Chance Ditch Between WCR II and poor width = 12' N/A 370 560 1,890 <br />Flume WCR 13 [202] length =30' <br />WCR 24 Arch CMP Between 1-25 and WCR fair span=8' N/A 240 290 1,000 <br />11 [203] rise=6' <br />IwCR 22 Arch CMP Between 1-25 and WCR i fair span=7.5' N/A 300 280 980 <br />11 [204] . rise=6' <br />Godding Ditch I S. of WCR 22 [204] i fair width=60' N/A 3,000 280 980 <br />Bridge/Flume length=8.5' <br />IwcR 20 Arch CMP I Between 1-25 and WCR I span = 8' <br />II [205] fair I rise=6' N/A 210 290 980 <br /> I Between 1-25 and WCR I ; span=8' <br />WCR 18 Arch CMP II [206] fair I rise=6' N/A 190 300 960 <br /> I Between 1-25 and WCR I fair, I <br />WCR 16 Arch CMP vegetation, span=8' N/A 160 250 860 <br />r""j ill [207] I encroachment . rise=6' <br />I . <br />.W 52 Pond and iBetween 1-25 and WCR I good span=8' 58 1,000 220 750 <br />.,CB Outlet i 11 [308] rise=6' <br />Coalridge Ditch Pond 10.2 miles S. of SHW good, some span=7' <br /> sediment 32 790 200 780 <br />and RCB Outlet 52 [309] hlockage rise=7' <br /> Between 1-25 and WCR fair, <br />WCR 12 CMP 11 [210] vegetation, diam.=3' N/A 60 180 780 <br /> encroachment <br />~~5 E. Frontage Road iN. ofWCR 10 E. side good span=3@20' N/A 2,050 40 260 <br />imber Bridge i of 1-25 [213] rise=5.5' <br /> I span=2@11' <br />1-25 Triple Barrel RCB I N. of WCR 10 on 1-25 good 1@14' N/A 2,460 40 260 <br /> [213] rise=6' <br />West WCR 10 Arch Between 1-25 and WCR poor, span=3.5' <br />CMP II [216] vegetation, rise=2' N/A 40 20 160 <br /> i scour <br />UPRR Timber Bridge S. WCR 10, between good span=3@13' N/A 1,450 20 120 <br />WCR 7 and 1-25 [217] rise=2.5' <br /> OTHER TRIBUTARY STRUCTURES <br />I-25/WCR 18 Pond Between WCR 16/18 at I fair I diam.=2' 170 140 40 80 <br />!with Twin RCP Outlets 1-25 [341] diam.=3' <br />I-25/SHW 52 Pond 0.15 miles N. of SHW fair, <br /> undersized diam.=3' 82 90 5 60 <br />RCP/C~P Outlet 52 at 1-25 [321] outlet <br />biO'" I WCR 10, S. of I . <br />It WCR 10 CMP I Speedway [236J fair diam. =4' N/A 70 80 370 <br /> I <br />'1~-25 Double Barrel IN. ofWCR 8 on 1-25 I fair, I foot of span= 10' N/A 430 70 310 I <br />RCB [237] deposition rise=3' <br /> <br />e <br /> <br />T:l,OPEMCowtIdOl1co~IdOJ pnb gadding hollow Ibl J. wpd <br /> <br />NoytrmMr U. 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.