My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09597
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:49 AM
Creation date
10/5/2006 4:29:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Marble Area
Basin
Gunnison
Title
Engineering Geologic Factors of the Marble Area
Date
6/1/1972
Prepared For
Gunnison County
Prepared By
Colorado Geological Survey
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 24 - <br /> <br />Environmental and Economic Problems Associated with Debris Dams <br /> <br />Some of the specific problems inp1icit in the above include: <br /> <br />(1) Land requirements for debris basins large enough to even temporarily, <br /> <br />alleviate the problem will be quite high, and the basins, whether empty <br /> <br />or full, will have unfavorable aesthetic impacts. (2) If the system is <br /> <br />to remain effective, the basins will have to be cleaned out after each <br /> <br />major mud flood event. If this isn't done, the system will either <br /> <br />overflow and divert to new 'channels, or revert to the "straightpipe" <br /> <br />method described earlier which had very unfavorable impacts and possible <br /> <br />legal complications in the river flood plain area. (3) If the required <br /> <br />frequent clean-out of debris is performed, the operation will be very <br /> <br />expensive, and there will be serious problems in disposal of the debris <br /> <br />in a safe, economical, and environmentally acceptable manner. As de- <br /> <br />scribed earlier, the mudf10w debris is not suitable for road base or <br /> <br />fill material unless placed as an engineered fill. If it is placed as <br /> <br />a dumped fill, it could be expected to readily become unstable upon <br /> <br />wetting, and create the old problem at a new location. <br /> <br />If a catchment basin solution is proposed for such an area, the <br /> <br />details and long-term cost of maintenance and debris disposal as well <br /> <br />as original construction should be carefully worked out so that neces- <br /> <br />sary funding can be arranged and the responsibility for the system <br /> <br />'clearly understood. Experience with this sort of control system in <br /> <br />California and Utah has been generally disappointing in the long term <br /> <br />because of inadequate basin si~e and/or lack of necessary clean-out <br /> <br />when required. <br /> <br />GALLO BLUFF-ELl< MOUNTAIN AREA (3) <br />, <br /> <br />Area of Active Rockfall and Potential Large Landslides (3a) <br /> <br />Gallo Bluff is a steep and barren cliff that rises abruptly <br />
The URL can be used to link to this page
Your browser does not support the video tag.