My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09590
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:48 AM
Creation date
10/5/2006 4:28:51 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Aurora
Stream Name
Cherry Creek Lake
Basin
South Platte
Title
Hydrologic Improvement Assessment Cherry Creek Lake
Date
9/1/1993
Prepared For
State of Colorado
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />discharges on Cherry Creek and the South Platte River and would completely <br /> <br />eliminate spillway discharges into Toll Gate and Sand Creeks. The outflow with <br /> <br />this alternative would be restricted to 5000 c.f.s. from the Cherry Creek outlet <br /> <br />works. The PMF reservoir routing is shown on plate 29. <br /> <br />DESCRIPTION OF ALTERNATIVES AND CONSTRUCTION COSTS <br /> <br />Table 14 presents a listing of the alternatives evaluated during the study <br /> <br />and their estimated construction cost. Table 15 presents capacity and cost data <br /> <br />for the dam crest raise alone. Included in the estimated construction costs are: <br /> <br />(1) The costs of fee title to the land which would be acquired in order to build, <br /> <br />maintain, and operate the structure; (2) the costs of flowage easements <br /> <br />downstream of the added spillways; (3) contingencies of 20 percent for <br /> <br />construction and 30 percent for lands; (4) engineering and design costs of 9 <br /> <br /> <br />percent; and (5) supervision and inspection costs of 6 percent, <br /> <br />Detailed cost estimates of representative alternatives are included in <br />Appendix B. <br /> <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.