My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09590
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:48 AM
Creation date
10/5/2006 4:28:51 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Aurora
Stream Name
Cherry Creek Lake
Basin
South Platte
Title
Hydrologic Improvement Assessment Cherry Creek Lake
Date
9/1/1993
Prepared For
State of Colorado
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RECONNAISSANCE REPORT <br />CHERRY CREEK LAKE, COLORADO <br />HYDROLOGIC IMPROVEMENT ASSESSMENT <br /> <br />TABLE OF CONTENT~l <br /> <br />Ieem <br /> <br />STUDY AUTHORITY <br />PROJECT AUTHORITY <br />STUDY PURPOSE AND SCOPE <br />PRIOR STUDIES AND REPORTS <br />BASIN DESCRIPTION <br />PROJECT DESCRIPTION <br />PROJECT LOCATION <br />GENERAL DESCRIPTION <br />WATER IMPOUNDMENT HISTORY <br />OUTLET WORKS <br />SPILLWAY <br />OPERATION AND MAINT&~ANCE HISTORY <br />HYDROLOGIC ANALYSIS OF PROJECT <br />GENERAL <br />RUNOFF CHARACTERISTICS <br />UNIT HYDROGRAPH <br />RESERVOIR DESIGN FLOOD <br />INFLOW DESIGN FLOOD <br />RESERVOIR ROUTING <br />DETERMINATION OF THE EXISTING TH..1U:SHOLD FLOOD <br />ROUTING OF THE EXISTING THRESHOLD FLOO~ <br />PROBABLE MAXIMUM FLOOD ROUTING <br />DETERMINATION OF THE BASE SAFETY CONDITIONS <br />FLOOD DAMAGE STUDIES <br />FLOOD PLAIN DEVELOPMENT <br />POTEi'lTIAL FLOOD DAMAGES <br />PROJECT BENEFITS <br />POPULATION SAFETY <br />WITHOUT DAM ANALYSIS <br />PLAN FORMULATION AND EVALUATION <br />INTRODUCTION <br />HYDROLOGIC ANALYSIS OF ALTERNATIVES <br />DESCRIPTION OF ALTERNATIVES AND CONSTRUCTION <br />&~IRONMEi~TAL CONSIDERATIONS <br />EVALUATION OF ALTERNATIVES <br />TEi~TATIVE PLAN SELECTION <br />SUl1l1ARY OF COORDINATION AJ.'ID PUBLIC INVOLVEMENT <br />COST-SHARING <br />CONCLUSIONS <br />RECOMMENDATIONS <br /> <br />1 <br /> <br /> Pae:e <br /> 1 <br /> 1 <br /> 1 <br /> 2 <br /> 6 <br /> 7 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 12 <br /> 13 <br /> 14 <br /> 14 <br /> 15 <br /> 15 <br /> 16 <br /> 17 <br /> 19 <br /> 23 <br /> 23 <br /> 27 <br /> 29 <br /> 32 <br /> 32 <br /> 33 <br /> 33 <br /> 34 <br /> 38 <br /> 39 <br /> 39 <br /> 40 <br />COSTS 44 <br /> 56 <br /> 63 <br /> 70 <br /> 77 <br /> 78 <br /> 79 <br /> 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.