Laserfiche WebLink
<br />_=c <br />-"",,,,;.. <br />n'. <br />,- <br /> <br />EL PA~,O COUNTJI' <br /> <br />_____111___ <br /> <br />- <br /> <br />-~ <br /> <br />.- <br /> <br />__'1 <br /> <br />COLORADO DEPARTMENT OF TRANSPORT)I TION - Ra4DWAI y, URBAN AND <br />RURAL SAFETY STUDIES <br /> <br />HDR performed an evaluation of accident history, safety evaluation, and complied a comprehensiv.: <br />facility inventory for 160.9 km (100 mi) of highway on SH-115 and SH-50 (U.S. 50) in Colorado to <br />determine high/severe accident locations. These areas were then evaluated to determine the most <br />effective improvements to reduce accidents and severity. A benefit/cost procedure was used in <br />determining the effectiveness of the solutioIlS. Evaluation of traffic patterns to and from the Fort <br />Carson military facility and familiarity with the southern Colorado Springs access were uniqw: <br />project elements that were useful to the proposed I-25 Traffic Impact Study. <br /> <br />Client: Colorado Department of Transportation <br /> <br />Net Fees: $102,400 <br /> <br />Location: SH-115 <br /> <br />1999 Flood Documentation r~eport <br />HDR Enginoering, fne. <br /> <br />;(6f'<:Q?o~ <br />~~~~:;\ <br />\:(;j',;~<:; <br />~,~~0A <br />'-t1H'!}/ <br />