<br />For floodplain management applications, the map shows by tints, screens, and symbols the 100-
<br />and 500-year floodplains, f100dways, and the locations of selected cross sections used in the
<br />hydraulic analyses and f100dway computations.
<br />
<br />7.0 OTHER STUDIES
<br />
<br />Delailed information on Dry Creek from its mouth in Larimer County, through the City of Fort
<br />Collins, and continuing upstream to a point again in Larimer County, is provided in the report
<br />by the USACE, Omaha District, and was the basis for the 1983 revision to this study. Both the
<br />USACE's report and this report are in complete agreement for Dry Creek (Reference 6).
<br />
<br />Additional information on Boxelder Creek is provided in a study by Simons, Li & Associates,
<br />Inc., in 1981 (Reference 2) and by the NRCS report in 1983 (Reference 27). Information from
<br />these reports was utilized by the USBR in its 1992 study of BoxeIder Creek.
<br />
<br />In August 1981, Simons, Li & Associates, Inc., completed a Master Drainageway Planning Study
<br />for BoxeIder Creek and Cooper Slough in the vicinity of the City of Fort Collins (Reference 2).
<br />The approximate flood boundaries for Boxelder Creek were laken from this study.
<br />
<br />The Flood Insurance Study report for the unincorporated areas of Larimer County, Colorado, is
<br />presently being revised to reflect the updated information for the Cache La Poudre River, Spring
<br />Creek, and Cooper Slough. The Larimer County Flood Insurance Study report is in complete
<br />agreement for these streams with the City of Fort Collins Flood Insurance Study report.
<br />
<br />This study is authorilative for the purposes of the NFIP; data presented herein either supersede
<br />or are compatible with all previous determinations.
<br />
<br />8.0 LOCA nON OF DATA
<br />
<br />Information concerning the pertinent dala used in the preparation of this study can be oblained
<br />by contacting FEMA, Mitigation Division, Denver Federal Center, Building 710, Box 25267,
<br />Denver, Colorado 80225-0267.
<br />
<br />9.0 BIBLIOGRAPHY AND REFERENCES
<br />
<br />1. U.S. Department of the Army, Corps of Engineers, Omaha District, Engineering Division
<br />Technical Report, Hydrolo"ic Analysis of the Cache La Poudre Basin, April 1988
<br />
<br />2. Simons, Li & Associates, Inc., Cooper Slough. Boxelder Creek Master Draina~eway
<br />Plannin" Study City of Fort Collins Larimer County Colorado, August 1981
<br />
<br />3. R&D Aerographics, Area V Flood Plain Study Ml\j)s, Scale 1:1,200, Contour Interval 2
<br />feet, City of Fort Collins, Colorado, Flown May 4, 1979
<br />
<br />4. Simons, Li & Associates, Inc., Stormwater Management Model Output of Cooper Slough
<br />and BoxeIder Creek, prepared for Cooper Slou~h-Boxe]der Creek Master Drainageway
<br />Planning Study. August 1981
<br />
<br />33
<br />
|