My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09553
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:25 AM
Creation date
10/5/2006 4:27:33 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
45
County
Adams
Arapahoe
Douglas
Community
Denver Metro Region
Basin
South Platte
Title
Request for Designation - Major Drainageway Master Plan Big Dry Creek, Volumes I and II
Date
6/1/1975
Designation Date
7/1/1975
Floodplain - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />l?esoLj"",s ;( ~ <br />, <br /> <br />GONTAO~ <br />d~ 0", <br />~~% <br />~ TID ~. <br />&. ' <br />,g> <br />vl0 ~ <br />"f>.. ,0 <br />iV/D'1:/a \-l~<O <br /> <br />eculive Commil1ee: <br /> <br />Wally Toevs <br />Boulder County <br />Cathy Reynolds <br />City of Denver <br />Kenneth M. Gorrell <br />City 01 Arvada <br />Kenneth M. Macintosh <br />City of Denver <br />John J. Nicholl <br />Arapahoe County <br /> <br />'embers: <br />) <br /> <br />Hal Anderson <br />Jefferson County <br />Bob Briggs <br />Adams County <br />Ruth A. Correll <br />City of Boulder <br />David A. Day <br />Engineer <br />W.G. Duncan <br />Douglas County <br /> <br />William H. McNichols <br />City of Denver ~ <br />Sally Parsons LU <br />City of Litllcton t: <br />:J <br />Arlen E. Patlon (I) <br />Engineer <br />Anthony E. Richler <br />Cily 01 Thornton <br />M.L. "Sam" Sandos <br />Cily 01 Denver <br /> <br />L. Scott Tucker, Executive Director <br /> <br /> <br />August 8, 1979 <br /> <br />M E M 0 RAN DUM <br /> <br />I TO <br /> <br />L. Scott <br /> <br />Creek (Ar/)aho~ Countyl Master <br /> <br />Tucker~ j r <br /> <br />to the Big Dry Master plan <br /> <br />Big Dry <br /> <br />Plan Holders <br /> <br />N <br />g FROM <br />o <br />o <br />~ <br />~ SUBJECT: Revision <br />" <br />o <br />o <br />" <br />~,. During the intervening period since the original "Major Drainageway <br />~ Master Plan, Big Dry Creek," dated June, 1975 and prepared by VTN Engi- <br />. neers, was distributed to your office additional hydraulic analysis has <br />w resulted in changes to the lOO-year flood plain limit and water surface <br />~ profile for existing channel conditions. Also, channel improvements and <br />~ urbanization have taken place at certain locations along the Big Dry <br />~ Creek which has also resulted in changes. <br /><0 <br />N <br /> <br />~ The Master Plan sheets that required revision are as follows: <br />o <br />~ Sheets 1 ,8,11 ,12,13,14 and 15. These sheets are t ransmi tted herewith <br />N for inclusion in the bound Volume Two of the Big Dry Master Plan. Thank <br />~you for your cooperation in updating this Master Plan. <br /> <br />~ SJH/LST/lf <br />~ <br />N <br /><0 <br />.;, Enclosures <br />"' <br />~ <br />w <br />z <br />o <br />I <br />~ <br />W <br />" <br />_UJ__ <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.