My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09516
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:30 AM
Creation date
10/5/2006 4:25:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Huerfano
Community
Walsenburg
Basin
Arkansas
Title
Flood Hazard Mitigation for Holita Ditch Walsenburg
Date
2/1/1997
Prepared For
Walsenburg
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />runoff that flowed into it from the higher ground to the north, This system did not seem <br />to cause any major problems until recent years when street paving projects, curb and <br />gutter projects, and development on the north side of the city decreased infiltration and <br />increased storm water runoff. A new conveyance system is needed to handle the <br />stormwater runoff and to prevent flooding problems along the Holita Ditch, <br /> <br />V. DATA COLLECTION <br /> <br />On October 24, 1995, the CWCB completed a field visit to the City of Walsenburg to <br />meet with local officials and to gather information and field data pertinent to the project. <br />In addition, field investigations were performed by the Colorado School of Mines project <br />team on February 18, 1996. <br /> <br />VI, AL TERNA TIVE PROJECT PLANS <br /> <br />Two methods of providing flood conveyance downstream of the storm drain outfall at <br />Holita Ditch were investigated, They are as follows: <br /> <br />I. Ditch capacity expansion: Augment the existing capacity of the Holita <br />Ditch along the reach between the storm drain outfall (Russell Avenue) <br />and the culvert at Interstate 25. This would involve excavating a larger <br />channel cross-section and providing a levee along the south bank of the <br />ditch. This work would require that the ditch owners cooperate with the <br />City and allow the ditch to continue to carry stormwater runoff from the <br />storm drain. In addition, this alternative would require the removal of <br />numerous trees and shrubs along the project reach, <br /> <br />2, New storm sewer from the existing storm drain outfall to the <br />Cucharas River: Construct storm sewer pipeline along Russell A venue <br />from the existing storm drain outlet downstream to the Cucharas River. <br />This alternative would also require crossing the railroad tracks south of <br />Colorado Avenue, This alternative could also conflict with existing <br />underground utility lines that may have to be relocated, <br /> <br />The two alternatives were developed based on the criteria of mitigation benefits, <br />construction methods and costs, and project feasibility, The plan sheet and typical detail <br />sheets for the two alternatives are presented on plates 1 through 3, <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.