My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09516
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:30 AM
Creation date
10/5/2006 4:25:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Huerfano
Community
Walsenburg
Basin
Arkansas
Title
Flood Hazard Mitigation for Holita Ditch Walsenburg
Date
2/1/1997
Prepared For
Walsenburg
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />TABLE 2 <br /> <br /> Flood Hazard Mitigation Feasibility Study <br /> Project Cost Estimate <br /> Alternative 2: New Storm Sewer to Cucharas River <br /> Walsenburg, Colorado <br /> January 1997 <br /> Item Unit Unit Cost Quantity Cost <br />1, Mobilization LS $5,000 1 $5,000 <br />3. Install 54" Diameter RCP LF $125 3700 $462,500 <br />3. Install Casino beneath Railroad Tracks LS $8,000 1 $8,000 <br />4, Install Manholes EA $2,500 8 $20,000 <br />5, Storm Sewer Outfall and Flapgate LS $2,500 1 $2,500 <br />6, Restoration and Pavement Repair LS $30,000 1 $30,000 <br />7, Traffic Control LS $4,000 1 $4,000 <br /> Subtotal $532,000 <br /> 10% Continoency $53,200 <br /> Subtotal Construction Cost $585,200 <br /> CWCS Feasibility Study $6,000 <br /> 12% Engineering $70,224 <br /> 7% Administration and Inspection $40,964 <br /> Total Project Cost $702,388 <br /> <br />COST-W2,XLS <br /> <br />1/24/97 11 :09 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.